Mid-and-Long-Term Roadmap Towards Decommissioning of the Fukushima Daiichi Nuclear Power Station
Council for the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Plant
The committee for measures to decommission the TEPCO Fukushima Daiichi Nuclear Power Station changed from the "Working Council" to the "Council for the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Plant" in January 2013. (Reports prior to January 2013 are published in "Working Council".)
- December 24
- November 26
- October 29
- October 1
- August 27 * Revised on September 1.
- July 30
- June 25
- May 28
- April 30
- March 26
- February 26
- January 29
- December 26
- November 28
- October 31
- September 26
- August 29
- July 25
- June 27
- May 30
- April 26
- March 28
- March 7
- January 31
*The Working Council and the Research & Development Headquarters meeting was not held in January, 2013.
Working Council
December 25, 2012
December 3, 2012
- Progress Status and Future Challenges of Mid-to-long Term Roadmap towards the Decommissioning of Units 1-4 of TEPCO Fukushima Daiichi Nuclear Power Station (PDF 2.01MB)
- Progress Status and Future Challenges of Mid-to-long Term Roadmap towards the Decommissioning of Units 1-4 of TEPCO Fukushima Daiichi Nuclear Power Station (Outline) (PDF 827KB)
October 22, 2012
[Topics]
September 24, 2012
August 27, 2012
July 30, 2012
June 25, 2012
[Topics]
May 28, 2012
April 23, 2012
March 28, 2012
[Topics]
February 27, 2012
[Topics]
- Implementation of PCV Internal Inspection at Unit 2 (2nd Inspection) (PDF 102KB)
- Reliability Improvement Works of Contaminated Water Processing Facilities (PDF 70.0KB)
- Multi-nuclide Removal Equipment (PDF 305KB)
- Progress Status of Sub-drain Purification Test (PDF 131KB)
- Plan for Replacement and Additional Installation of Processed Water Receiving Tanks (PDF 113KB)
- Rubble Management at Fukushima Daiichi Nuclear Power Station (PDF 134KB)
- Evaluation Results of Additional Release rate from PCVs in the Fukushima Daiichi Nuclear Power Station (PDF 108KB)
- Investigation on the operating floor of the Reactor Building of Unit 2 Fukushima Daiichi NPS (PDF 94.7KB)
January 23, 2012
[Topics]
Technical Meeting to Review the Implementation Plan for the Specified Nuclear Facility
December 27 (The 4th Meeting)
- 【Material 1-1】 Supplementary explanation on conformity to the Items required for Measures which should be taken at Tokyo Electric Power Co., Inc.’s Fukushima Daiichi Nuclear Power Station in line with the Designation as the Specified Nuclear Facility (Change in operation structure for the discharge of ALPS treated water into the sea and selection of nuclides to be measured and assessed)(PDF 4.40MB)
- 【Material 1-2】 Reassessment results of Radiological Environmental Impact Assessment (Construction stage) due to revising nuclides to be measured and assessed(PDF 2.49MB)
- 【Material 1-3】 Issues pointed out in the implementation plan concerning the change in the operation structure and the selection of nuclides to be measured and assessed for the discharge of ALPS treated water into the sea(PDF 159KB)
December 21 (The 3rd Meeting)
- 【Material 1-1-1】 Supplementary explanation on conformity to the Items required for Measures which should be taken at Tokyo Electric Power Co., Inc.’s Fukushima Daiichi Nuclear Power Station in line with the Designation as the Specified Nuclear Facility (Change in operation structure for the discharge of ALPS treated water into the sea and selection of nuclides to be measured and assessed)(PDF 4.40MB)
- 【Material 1-1-2】 Comparison of the sum of the ratios to regulatory concentrations limits at ALPS inlet/outlet [Revised Version](PDF 164KB)
- 【Material 1-2】 Issues pointed out in the implementation plan concerning the change in the operation structure and the selection of nuclides to be measured and assessed for the discharge of ALPS treated water into the sea(PDF 159KB)
- 【Material 2-1】 Verification of analytical values of tritium in fish in sea area monitoring for the sea discharge of the water treated by the Advanced Liquid Processing System, etc. of Fukushima Daiichi Nuclear Power Station (Report)(PDF 5.02MB)
December 7 (The 2nd Meeting)
- 【Material 1-1-1】 Supplementary explanation on conformity to the Items required for Measures which should be taken at Tokyo Electric Power Co., Inc.’s Fukushima Daiichi Nuclear Power Station in line with the Designation as the Specified Nuclear Facility (Change in operation structure for the discharge of ALPS treated water into the sea and selection of nuclides to be measured and assessed)(PDF 4.35MB)
- 【Material 1-1-2】 Comparison of the sum of the ratios to regulatory concentrations limits at ALPS inlet/outlet(PDF 162KB)
- 【Material 1-2】 Radiological Environmental Impact Assessment Regarding the Discharge of ALPS Treated Water into the Sea (Construction stage)(PDF 3.02MB)
- 【Material 1-3】 Issues pointed out in the implementation plan concerning the change in the operation structure and the selection of nuclides to be measured and assessed for the discharge of ALPS treated water into the sea(PDF 98.6MB)
November 21 (The 1st Meeting)
- 【Material 1-1】 Changes in operation structure for discharge of ALPS treated water into sea and selection of nuclides to be measured and assessed [Outline](PDF 1.43MB)
- 【Material 1-2】 Supplementary explanation on conformity to the Items required for Measures which should be taken at Tokyo Electric Power Co., Inc.'s Fukushima Daiichi Nuclear Power Station in line with the Designation as the Specified Nuclear Facility (Operation structure for the discharge of ALPS treated water into the sea and selection of nuclides to be measured and assessed)(PDF 3.28MB)
- 【Material 1-3】 Radiological Environmental Impact Assessment Regarding the Discharge of ALPS Treated Water into the Sea (Construction stage)(PDF 3.02MB)
Review Meeting on the Implementation Plan Regarding the Handling of ALPS Treated Water
March 18 (the 13th Meeting)
March 10 (the 12th Meeting)
March 1 (the 11th Meeting)
February 25 (the 10th Meeting)
February 15 (the 9th Meeting)
February 7 (the 8th Meeting)
- Installation of New ALPS Treated Water Dilution/ Discharge Facilities and the Related Facility(PDF 8.37MB)
- Briefing schedule for the Review Meeting on the Implementation Plan Regarding the Handling of ALPS Treated Water (draft)(PDF 16.0KB)
February 1 (the 7th Meeting)
- Installation of New ALPS Treated Water Dilution/Discharge Facilities and Related Facilities(PDF 1.81MB)
- Briefing schedule for the Review Meeting on the Implementation Plan Regarding the Handling of ALPS Treated Water (draft)(PDF 16.6KB)
January 27 (the 6th Meeting)
January 20 (the 5th Meeting)
January 11 (the 4th Meeting)
December 24 (the 3rd Meeting)
Other relation data
March 20, 2014
March 14, 2012
International Experts' Symposium on the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Plant Unit 1-4
- Current Situation of Fukushima-Daiichi Nuclear Power Plants and Difficulties in the Defueling Plan (PDF 3.04MB)
- Research plan regarding improvement of simulation code for understanding the status of fuel debris in the reactor(PDF 1.70MB)
- Development of technologies for the processing and disposal of radioactive waste (PDF 185KB)
*Revised on Mar 22, 2012