News Releases
Public materials relating to the Fukushima Daiichi Nuclear Power Station are made available.
Reference Materials
- Jun 28, 2024
- Fukushima Daiichi Nuclear Power Station Commencement of the discharge of ALPS treated water into the sea (third discharge in FY2024)(1.78MB)
- Jun 27, 2024
- Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation/ Preparation Status of Fuel Debris Trial Retrieval(2.63MB)
- Jun 27, 2024
- ALPS Treated Water Discharge Status Update(8.29MB)
- Jun 26, 2024
- Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group B And the Scheduled Date of the Commencement of the Third Discharge in FY2024(578KB)
- Jun 13, 2024
- Measures pertaining to the fish inside the port of Fukushima Daiichi Nuclear Power Station (Completion of the construction to re-cover the seafloor of the Units 1-4 intake open channel)(1.30MB)
- Jun 4, 2024
- Fukushima Daiichi Nuclear Power Station Completion of the Second Discharge of ALPS Treated Water in FY2024(534KB)
*From May 2022, the page for posting the analysis results of fish and shellfish was changed. Please see here.