search



Corporate Information

 
|  2018  |  2017  |  2016  |  2015  |  2014  |  2013  |  2012  |  2011  |  2010  |  2009  |  2008  |  2007  |  2006  |  2005  |  2004  |  2003  |  2002  |

| Dec | Nov | Oct | Sep | Aug | Jul | Jun | May | Apr | Mar | Feb | Jan |

(Aug 31,2011)Evaluation status of internal exposure dose of emergency workers
(Aug 31,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 31)
(Aug 31,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, August 31)
(Aug 31,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 31)
(Aug 31,2011)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station (10th Release)
(Aug 31,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 30)
(Aug 31,2011)Basic Design of Water Shield Wall at the Seaside
(Aug 31,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (161st release)
(Aug 31,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (159th release)
(Aug 31,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, August 31)
(Aug 31,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 31)
(Aug 30,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, August 30)
(Aug 30,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 30)
(Aug 30,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 29)
(Aug 30,2011)Nuclide analysis result of radioactive materials in the seawater collected in the offshore area of Ibaraki Prefecture (continued report 26)
(Aug 30,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 29)
(Aug 30,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (160th release)
(Aug 30,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (158th release)
(Aug 30,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 30)
(Aug 30,2011)Permanent Compensation for Nuclear Damages by the Accident at Fukushima Daiichi Nuclear Power Station and Fukushima Daini Nuclear Power Station
(Aug 30,2011)Fuel Cost Adjustment in Electricity Fees for October 2011
(Aug 30,2011)Partial corrections to results of nuclide analyses of radioactive materials at Fukushima Daiichi Nuclear Power Station of TEPCO provided in previous press releases
(Aug 30,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, August 30)
(Aug 30,2011)Lift Date Advance of Electricity Consumption Restriction per Article 27 of Electricity Business Act
(Aug 30,2011)Submission of report regarding Regarding the additional opinion of NISA for the analysis of reporting the results of evaluation of earthquake-proof safety of existing reactor facilities for power generation, referring to the new earthquake-proof standards
(Aug 30,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 30)
(Aug 29,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 28)
(Aug 29,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, August 29)
(Aug 29,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 29)
(Aug 29,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (157th release)
(Aug 29,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 28)
(Aug 29,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (159th release)
(Aug 29,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 29)
(Aug 29,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, August 29)
(Aug 28,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, August 28)
(Aug 28,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (156th release)
(Aug 28,2011)Nuclide analysis results of radioactive materials in the seawater collected in the offshore area of Miyagi Prefecture (4th release)
(Aug 28,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 27)
(Aug 28,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (158th release)
(Aug 28,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 28)
(Aug 28,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 28)
(Aug 28,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 28)
(Aug 28,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, August 28)
(Aug 27,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, August 27)
(Aug 27,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 26)
(Aug 27,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (157th release)
(Aug 27,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 27)
(Aug 27,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 27)
(Aug 27,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 26)
(Aug 27,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (155th release)
(Aug 27,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, August 27)
(Aug 27,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 27)
(Aug 26,2011)Power Supply and Demand Outlook in This Summer and Measures(12th Release)
(Aug 26,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (154th release)
(Aug 26,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, August 26)
(Aug 26,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 26)
(Aug 26,2011)Nuclide analysis result of radioactive materials in the seawater collected in the offshore area of Ibaraki Prefecture (continued report 25)
(Aug 26,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (156th release)
(Aug 26,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 25)
(Aug 26,2011)Submission of Reports about the study regarding current earthquake-proof safety and reinforcement of reactor buildings at Fukushima Daiichi Nuclear Power Station to Nuclear and Industrial Safety Agency, Ministry of Economy, Trade and Industry (3)
(Aug 26,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 26)
(Aug 26,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, August 26)
(Aug 26,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 26)
(Aug 25,2011)Partial correction to results of nuclide analyses of radioactive materials
(Aug 25,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake(as of 3:00 pm, August 25)
(Aug 25,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 24)
(Aug 25,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (155th release)
(Aug 25,2011)Detection of radioactive materials in the soil in Fukushima Daiichi Nuclear Power Station (30th release)
(Aug 25,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (153rd release)
(Aug 25,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 24)
(Aug 25,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 25)
(Aug 25,2011)Additional Qualified Persons for Payment of "Additional Temporary Compensation" for Damage & Losses due to Evacuations etc.
(Aug 25,2011)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of August 25)
(Aug 25,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 25)
(Aug 25,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 25)
(Aug 25,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, August 25)
(Aug 24,2011)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station(9th Release)
(Aug 24,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (154th release)
(Aug 24,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, August 24)
(Aug 24,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 14)
(Aug 24,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 23)
(Aug 24,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (152nd release)
(Aug 24,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 24)
(Aug 24,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 24)
(Aug 24,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 24)
(Aug 24,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, August 24)
(Aug 23,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, August 23)
(Aug 23,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 22)
(Aug 23,2011)Nuclide analysis result of radioactive materials in the seawater collected in the offshore area of Ibaraki Prefecture (continued report 24)
(Aug 23,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 22)
(Aug 23,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (153rd release)
(Aug 23,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 4:00 pm, August 23)
(Aug 23,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (151st release)
(Aug 23,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 23)
(Aug 23,2011)(Announcement)Correction of Electricity Actual Demand in "TEPCO Electricity Forecast"
(Aug 23,2011)Receipt of instruction document from NISA on "Response to Data Mis-entry Made by Kansai Electric Power Co., Inc., Regarding Seismic Safety Assessment for Reactor Buildings and Auxiliary Reactor Buildings of Units 3 and 4, Takahama Nuclear Power Station"
(Aug 23,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 23)
(Aug 23,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, August 23)
(Aug 22,2011)Report to NISA on "Response to Data Misentry Made by Kyusyu Electric Power Co., Inc., Regarding Seismic Safety Assessment for Reactor Building and Auxiliary Reactor Building of Unit 3, Genkai Nuclear Power Station"
(Aug 22,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 21)
(Aug 22,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, August 22)
(Aug 22,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 22)
(Aug 22,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 22)
(Aug 22,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (152nd release)
(Aug 22,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (150th release)
(Aug 22,2011)Commencement of Regular Inspection for Unit 7 of Kashiwazaki Kariwa Nuclear Power Station
(Aug 22,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, August 22)
(Aug 22,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 22)
(Aug 21,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 20)
(Aug 21,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (151st release)
(Aug 21,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, August 21)
(Aug 21,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 21)
(Aug 21,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (149th release)
(Aug 21,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 21)
(Aug 21,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, August 21)
(Aug 21,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 21)
(Aug 20,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, August 20)
(Aug 20,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 19)
(Aug 20,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (150th release)
(Aug 20,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 19)
(Aug 20,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (148th release)
(Aug 20,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 20)
(Aug 20,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 20)
(Aug 20,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 20)
(Aug 20,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 20)
(Aug 19,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (149th release)
(Aug 19,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 6:00 pm, August 19)
(Aug 19,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 18)
(Aug 19,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 19)
(Aug 19,2011)Nuclide analysis result of radioactive materials in the seawater collected in the offshore area of Ibaraki Prefecture (continued report 23)
(Aug 19,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (147th release)
(Aug 19,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug. 19)
(Aug 19,2011)Power Supply and Demand Outlook in This Summer and Measures(11th Release)
(Aug 19,2011)(Information)Plant status after an earthquake occurred at Fukushima Daini Nuclear Power Station (as of 3 pm, August 19)
(Aug 19,2011)(Information) Plant status after an earthquake occurred at Fukushima Daiichi Nuclear Power Station (as of 3 pm, August 19)
(Aug 19,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 19)
(Aug 19,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 19)
(Aug 18,2011)Submission of reports to NISA regarding results of earthquake response analysis using observed seismic data collected at Fukushima Daiichi and Daini Nuclear Power Station during the Tohoku-Taiheiyou-Oki Earthquake, etc. (Vol. 3)
(Aug 18,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (148th release)
(Aug 18,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (146th release)
(Aug 18,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 18)
(Aug 18,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 4:00 pm, Aug. 18)
(Aug 18,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 17)
(Aug 18,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 17)
(Aug 18,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 18)
(Aug 18,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 18)
(Aug 18,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug. 18)
(Aug 18,2011)Power Supply to Tohoku Electric Power Company (August 18)
(Aug 17,2011)Detection of radioactive materials in the soil in Fukushima Daiichi Nuclear Power Station (29th release)
(Aug 17,2011)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station(8th Release)
(Aug 17,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (145th release)
(Aug 17,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 17)
(Aug 17,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 17)
(Aug 17,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 17)
(Aug 17,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (147th release)
(Aug 17,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 16)
(Aug 17,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 17)
(Aug 17,2011)Progress status of "Roadmap towards Restoration from the Accident at Fukushima Daiichi Nuclear Power Station" on August 17
(Aug 17,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 17)
(Aug 17,2011)Power Supply to Tohoku Electric Power Company (August 17)
(Aug 16,2011)(Announcement)Regarding the correction of "Detection of slight amount of radioactive materials by periodic radioactivity measurement at Kashiwazaki Kariwa Nuclear Power Station (update)"
(Aug 16,2011)(Announcement)Detection of slight amount of radioactive materials by periodic radioactivity measurement at Kashiwazaki Kariwa Nuclear Power Station (update)<Evaluation on Measurement Results for 1Q by Niigata Technical Communications Conference>
(Aug 16,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (146th release)
(Aug 16,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 15)
(Aug 16,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (144th release)
(Aug 16,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 15)
(Aug 16,2011)Nuclide analysis result of radioactive materials in the seawater collected in the offshore area of Ibaraki Prefecture (continued report 22)
(Aug 16,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 16)
(Aug 16,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 16)
(Aug 16,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 16)
(Aug 16,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake(as of 9 AM, August 16)
(Aug 16,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 16)
(Aug 15,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 15)
(Aug 15,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (145th release)
(Aug 15,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (143rd release)
(Aug 15,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 14)
(Aug 15,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 15)
(Aug 15,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 15)
(Aug 15,2011)Regarding Additional Temporary Payments for Persons Engaged in Agriculture and Forestry for Losses Caused by the Nuclear Accident
(Aug 15,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 15)
(Aug 15,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 15)
(Aug 14,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 14)
(Aug 14,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 14)
(Aug 14,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (144th release)
(Aug 14,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 14)
(Aug 14,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (142nd release)
(Aug 14,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 13)
(Aug 14,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 14)
(Aug 14,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 14)
(Aug 13,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (143rd release)
(Aug 13,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 12)
(Aug 13,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 12)
(Aug 13,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (141st release)
(Aug 13,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 13)
(Aug 13,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 13)
(Aug 13,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 13)
(Aug 13,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 13)
(Aug 13,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 13)
(Aug 12,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 11)
(Aug 12,2011)Nuclide analysis results of radioactive materials in the seawater collected in the offshore area of Miyagi Prefecture (3rd release)
(Aug 12,2011)Nuclide analysis result of radioactive materials in the seawater collected in the offshore area of Ibaraki Prefecture (continued report 21)
(Aug 12,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (140th release)
(Aug 12,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (142nd release)
(Aug 12,2011)Report to Nuclear and Industrial Safety Agency, Ministry of Economy, Trade and Industry in relation to the impact of Tohoku-Chihou Taiheiyo-Oki Earthquake to Nuclear Reactor Facilities at Fukushima Daini Nuclear Power Station
(Aug 12,2011)Report to NISA regarding the improvement of radiation exposures by workers who have exceeded dose limit while engaged in emergency works at Fukushima Daiichi Nuclear Power Station
(Aug 12,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 12)
(Aug 12,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 12)
(Aug 12,2011)Power Supply and Demand Outlook in This Summer and Measures(10th Release)
(Aug 12,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 12)
(Aug 12,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 12)
(Aug 12,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 12)
(Aug 12,2011)Power Supply to Tohoku Electric Power Company
(Aug 11,2011)Power Supply to Tohoku Electric Power Company
(Aug 11,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 11)
(Aug 11,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 13)
(Aug 11,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (141st release)
(Aug 11,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 10)
(Aug 11,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 10)
(Aug 11,2011)(Notice) Operational commencement of gas turbines donated by Electricity Generating Authority of Thailand (EGAT)
(Aug 11,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (139th release)
(Aug 11,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 11)
(Aug 11,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 11)
(Aug 11,2011)Partial Correction of Interim Report (revision) concerning Seismic Safety Evaluation of Unit 2 in Fukushima Daini Nuclear Power Station
(Aug 11,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 11)
(Aug 11,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 11)
(Aug 11,2011)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of August 11)
(Aug 11,2011)Power Supply to Tohoku Electric Power Company
(Aug 10,2011)Evaluation status of internal exposure "over 20mSv and less or equal to 50mSv" in March and April
(Aug 10,2011)Initial Response of Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi and Fukushima Daini Nuclear Power Station
(Aug 10,2011)Plant data etc of Fukushima Daini Nuclear Power Station at the time of the occurrence of Tohoku-Chihou-Taiheiyo-Oki Earthquake
(Aug 10,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 10)
(Aug 10,2011)(Notice)Commencement of Operation of Official Twitter Account for Rolling Blackouts
(Aug 10,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 10)
(Aug 10,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (140th release)
(Aug 10,2011)Nuclide analysis result of radioactive materials in the seawater collected in the offshore area of Ibaraki Prefecture (continued report 20)
(Aug 10,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (138th release)
(Aug 10,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 9)
(Aug 10,2011)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station (7th Release)
(Aug 10,2011)Commencement of Operation of Ukishima Solar Power Plant Promoting one of the largest solar power projects in Japan at coastal area of Kawasaki City-
(Aug 10,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 10)
(Aug 10,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 pm, Aug 10)
(Aug 10,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 10)
(Aug 10,2011)Power Supply to Tohoku Electric Power Company
(Aug 9,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 9)
(Aug 9,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (139th release)
(Aug 9,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 9)
(Aug 9,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 8)
(Aug 9,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 8)
(Aug 9,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 12)
(Aug 9,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (137th release)
(Aug 9,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 9)
(Aug 9,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 9)
(Aug 9,2011)FY 2011 First Quarter Financial Results (April 1 through June 30, 2011)
(Aug 9,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 9)
(Aug 9,2011)Power Supply to Tohoku Electric Power Company
(Aug 8,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 8)
(Aug 8,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 4:00 pm, August 8)
(Aug 8,2011)Improvement of Access Control at Fukushima Daiichi Nuclear Power Station
(Aug 8,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 8)
(Aug 8,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 7)
(Aug 8,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (136th release)
(Aug 8,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (138th release)
(Aug 8,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 11)
(Aug 8,2011)Power Supply to Tohoku Electric Power Company
(Aug 8,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 8)
(Aug 8,2011)Power Supply to Tohoku Electric Power Company
(Aug 8,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 8)
(Aug 7,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (137th release)
(Aug 7,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 6)
(Aug 7,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 10)
(Aug 7,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (135th release)
(Aug 7,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 7)
(Aug 7,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 7)
(Aug 7,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 7)
(Aug 7,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 7)
(Aug 7,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 7)
(Aug 6,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 4:00 pm, August 6)
(Aug 6,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 5)
(Aug 6,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 5)
(Aug 6,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (136th release)
(Aug 6,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake
(Aug 6,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (134th release)
(Aug 6,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 6)
(Aug 6,2011)Power supply to Tohoku Electric Power Company, Incorporated
(Aug 6,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 6)
(Aug 6,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 6)
(Aug 5,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 5)
(Aug 5,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (135th release)
(Aug 5,2011)Nuclide analysis result of radioactive materials in the soil of Fukushima Daiichi Nuclear Power Station (28th release)
(Aug 5,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 4)
(Aug 5,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (133rd release)
(Aug 5,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 4)
(Aug 5,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 5)
(Aug 5,2011)Power Supply and Demand Outlook in This Summer and Measures(9th Release)
(Aug 5,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 5)
(Aug 5,2011)(Comment) TEPCO President's comments on the interim guidelines governing nuclear disaster compensation due to the accident at Fukushima Daiichi and Daini Power Stations
(Aug 5,2011)Commencement of Regular Inspection for Unit 1 of Kashiwazaki Kariwa Nuclear Power Station
(Aug 5,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 5)
(Aug 5,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 5)
(Aug 4,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 4)
(Aug 4,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 4)
(Aug 4,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 4)
(Aug 4,2011)Nuclide analysis result of radioactive materials in the soil of Fukushima Daiichi Nuclear Power Station (27th release)
(Aug 4,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 3)
(Aug 4,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 3)
(Aug 4,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (134th release)
(Aug 4,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (132nd release)
(Aug 4,2011)Special Measures on electricity bills for customers who have evacuated from Specific Locations Recommended for Evacuation
(Aug 4,2011)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of August 4)
(Aug 4,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9 AM, August 4)
(Aug 4,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 4)
(Aug 3,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (131st release)
(Aug 3,2011)Submission of Report on the measures to continue water injection into reactors of Units 1 to 3 at Fukushima Daiichi Nuclear Power Station to NISA
(Aug 3,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 3)
(Aug 3,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (133rd release)
(Aug 3,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 2)
(Aug 3,2011)A report on installment of treatment facility and storing facility of water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station to Nuclear and Industrial Safety Agency of Ministry of Economy, Trade and Industry
(Aug 3,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3 PM, August 3)
(Aug 3,2011)Situation of Storing and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (6th Release)
(Aug 3,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 3)
(Aug 3,2011)TEPCO President's comments concerning the enactment of the Nuclear Disaster Compensation Law
(Aug 3,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 AM, August 3)
(Aug 3,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 3)
(Aug 2,2011)Receipt of instruction document from NISA regarding submission request for report on the measures to continue water injection into reactors of Unit 1 to 3 at Fukushima Daiichi Nuclear Power Station
(Aug 2,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 PM, August 2)
(Aug 2,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (132nd release)
(Aug 2,2011)Nuclide analysis result of radioactive materials in the seawater collected in the offshore area of Ibaraki Prefecture (continued report 19)
(Aug 2,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 1)
(Aug 2,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 2)
(Aug 2,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 1)
(Aug 2,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (130th release)
(Aug 2,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 2)
(Aug 2,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 AM, August 2)
(Aug 2,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 2)
(Aug 1,2011)Receipt of instruction document from NISA on a certificate for identification at Fukushima Daiichi Nuclear Power Station
(Aug 1,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Aug 1)
(Aug 1,2011)Pre-installment of Water Shield Wall at the Seaside
(Aug 1,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 PM, August 1)
(Aug 1,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (131st release)
(Aug 1,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on July 31)
(Aug 1,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (129th release)
(Aug 1,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, August 1)
(Aug 1,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Aug 1)
(Aug 1,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 AM, August 1)
back to page top


to TOP