(Sep 30,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 23)
(Sep 30,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 29)
(Sep 30,2011)Nuclide analysis results of radioactive materials in the seawater collected in the offshore area of Miyagi Prefecture (6th report)
(Sep 30,2011)Nuclide analysis result of radioactive materials in the seawater collected in the offshore area of Ibaraki Prefecture (continued report 30)
(Sep 30,2011)Evaluation status of internal exposure dose of emergency workers
(Sep 30,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (189th release)
(Sep 30,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (182nd release)
(Sep 30,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 30)
(Sep 30,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 30)
(Sep 30,2011)Special Measures for the electricity bills for the customers who have evacuated from the area to which evacuation order etc. have been directed, based on the Act on Special Measures Concerning Nuclear Emergency Preparedness, and who are eligible to permanent indemnification.
(Sep 30,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 30)
(Sep 30,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 30)
(Sep 30,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 30)
(Sep 29,2011)Partial correction of the report on results of earthquake response analysis of Unit 2 at Fukushima Daini Nuclear Power Station using observed seismic data during the Tohoku-Taiheiyou-Oki Earthquake
(Sep 29,2011)Final results of the nuclide analysis at Fukushima Daiichi Nuclear Power Station (for samples taken from July 16 to August 31)
(Sep 29,2011)Observed Seismic Data Collected at Fukushima Daiichi and Daini Nuclear Power Stations pertaining to the Tohoku-Taiheiyou-Oki Earthquake (Continued report)
(Sep 29,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 4:00 pm, September 29)
(Sep 29,2011)Detection of radioactive materials in the soil in Fukushima Daiichi Nuclear Power Station (33rd release)
(Sep 29,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on September 28)
(Sep 29,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (181st release)
(Sep 29,2011)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 29)
(Sep 29,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 28)
(Sep 29,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 29)
(Sep 29,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (188th release)
(Sep 29,2011)Fuel Cost Adjustment in Electricity Fees for November 2011
(Sep 29,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 29)
(Sep 29,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 29)
(Sep 29,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 29)
(Sep 28,2011)Implementation of Boring and Trenching Survey on Yunotake Fault
(Sep 28,2011)Report on the Accident Operation Manuals of Units 1 to 3 at Fukushima Daiichi Nuclear Power Station
(Sep 28,2011)Amendment of report to NISA in relation to the impact of Tohoku-Chihou Taiheiyo-Oki Earthquake to Nuclear Reactor Facilities at Fukushima Daini Nuclear Power Station
(Sep 28,2011)Amendment of report to NISA in relation to the impact of Tohoku-Chihou Taiheiyo-Oki Earthquake to Nuclear Reactor Facilities at Fukushima Daiichi Nuclear Power Station
(Sep 28,2011)Report to NISA regarding Investigation Results on Mistakes in Reports of Emergency Countermeasures for Safety
(Sep 28,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (187th release)
(Sep 28,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 27)
(Sep 28,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (180th release)
(Sep 28,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 28)
(Sep 28,2011)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station(14th Release)
(Sep 28,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 28)
(Sep 28,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 28)
(Sep 28,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 28)
(Sep 28,2011)Report on the Accident Operation Manuals of Units 1 to 3 at Fukushima Daiichi Nuclear Power Station
(Sep 28,2011)(Comment)Activity Suspension of "TEPCO Women's Football Club Mareeze" and Request to Japan Football Association regarding Transfer of Players
(Sep 28,2011)Activity Suspension of "TEPCO Women's Football Club Mareeze" and Request to Japan Football Association regarding Transfer of Players
(Sep 28,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 28)
(Sep 27,2011)Partial corrections to confirmed reports of results of nuclide analyses at Fukushima Daiichi Nuclear Power Station (continued report) -Countermeasures based on verbal directions of NISA-
(Sep 27,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (186th release)
(Sep 27,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (179th release)
(Sep 27,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on September 26)
(Sep 27,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 26)
(Sep 27,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake(as of 3:00 pm, September 27)
(Sep 27,2011)(Announcement) Compensation Forms for Farmers out of the Evacuation Area
(Sep 27,2011)(Announcement) Agreement Form for Indemnification for Corporations and Sole Proprietors
(Sep 27,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 27)
(Sep 27,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 27)
(Sep 27,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 27)
(Sep 27,2011)Receipt of instruction document from NISA regarding submission request for report on the operation manuals of Units 1 to 3 in case of accidents
(Sep 27,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 27)
(Sep 26,2011)The Supply and Demand Result for this summer
(Sep 26,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 22)
(Sep 26,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:30 pm, Sep. 26)
(Sep 26,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 26)
(Sep 26,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 25)
(Sep 26,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (178th release)
(Sep 26,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (185th release)
(Sep 26,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 26)
(Sep 26,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 26)
(Sep 26,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 26)
(Sep 25,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (184th release)
(Sep 25,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 25)
(Sep 25,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (177th release)
(Sep 25,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 24)
(Sep 25,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 25)
(Sep 25,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 25)
(Sep 25,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 25)
(Sep 25,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 25)
(Sep 24,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (183rd release)
(Sep 24,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (176th release)
(Sep 24,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on September 23)
(Sep 24,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 23)
(Sep 24,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 24)
(Sep 24,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 24)
(Sep 24,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 24)
(Sep 24,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 24)
(Sep 24,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 24)
(Sep 23,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (182nd release)
(Sep 23,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 22)
(Sep 23,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 23)
(Sep 23,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 23)
(Sep 23,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 23)
(Sep 23,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 23)
(Sep 23,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 23)
(Sep 22,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 22)
(Sep 22,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 22)
(Sep 22,2011)(Announcement)Extension of Planned Working Period of Regular Inspection for Unit 1, Kashiwazaki Kariwa Nuclear Power Station
(Sep 22,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 22)
(Sep 22,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on September 21)
(Sep 22,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 21)
(Sep 22,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (181st release)
(Sep 22,2011)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 22)
(Sep 22,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 22)
(Sep 22,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 22)
(Sep 21,2011)Permanent Indemnification for Nuclear Damages to Concerned Corporations and Sole Proprietors due to the Accident at Fukushima Daiichi Nuclear Power Station and Fukushima Daini Nuclear Power Station
(Sep 21,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 21)
(Sep 21,2011)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station (13th Release)
(Sep 21,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 21)
(Sep 21,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 21)
(Sep 21,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 20)
(Sep 21,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (180th release)
(Sep 21,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 21)
(Sep 21,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 21)
(Sep 20,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 20)
(Sep 20,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 19)
(Sep 20,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on September 19)
(Sep 20,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (179th release)
(Sep 20,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 20)
(Sep 20,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 20)
(Sep 20,2011)Progress status of "Roadmap towards Restoration from the Accident at Fukushima Daiichi Nuclear Power Station" on September 20
(Sep 20,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 20)
(Sep 20,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 20)
(Sep 19,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 4:00 pm, September 19)
(Sep 19,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 18)
(Sep 19,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (178th release)
(Sep 19,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 19)
(Sep 19,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 19)
(Sep 19,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 19)
(Sep 19,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake(as of 9:00 pm, September 19)
(Sep 18,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 17)
(Sep 18,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (177th release)
(Sep 18,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 18)
(Sep 18,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 18)
(Sep 18,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 18)
(Sep 18,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 18)
(Sep 18,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 18)
(Sep 17,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 4:00 pm, September 17)
(Sep 17,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 17)
(Sep 17,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 17)
(Sep 17,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 21)
(Sep 17,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 16)
(Sep 17,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on September 16)
(Sep 17,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (175th release)
(Sep 17,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (176th release)
(Sep 17,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 17)
(Sep 17,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 17)
(Sep 16,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 4:00 pm, September 16)
(Sep 16,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (174th release)
(Sep 16,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 16)
(Sep 16,2011)Nuclide analysis results of radioactive materials in the seawater collected in the offshore area of Miyagi Prefecture (5th report)
(Sep 16,2011)Nuclide analysis result of radioactive materials in the seawater collected in the offshore area of Ibaraki Prefecture (continued report 29)
(Sep 16,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 20)
(Sep 16,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 15)
(Sep 16,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (175th release)
(Sep 16,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 16)
(Sep 16,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 16)
(Sep 16,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 16)
(Sep 16,2011)Power Supply to Tohoku Electric Power Company
(Sep 15,2011)Evaluation status of internal exposure dose of emergency workers
(Sep 15,2011)Receipt of instruction document from NISA on "Regarding Investigation of Mistakes in Reports of Emergency Countermeasures for Safety (Instruction) "
(Sep 15,2011)Detection of radioactive materials in the soil in Fukushima Daiichi Nuclear Power Station (32nd release)
(Sep 15,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 15)
(Sep 15,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 15)
(Sep 15,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 19)
(Sep 15,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (174th release)
(Sep 15,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 14)
(Sep 15,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on September 14)
(Sep 15,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (173rd release)
(Sep 15,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 15)
(Sep 15,2011)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 15)
(Sep 15,2011)Power Supply to Tohoku Electric Power Company
(Sep 15,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 15)
(Sep 15,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 15)
(Sep 14,2011)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station(12th Release)
(Sep 14,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 4:00 pm, September 14)
(Sep 14,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 14)
(Sep 14,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (172nd release)
(Sep 14,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 13)
(Sep 14,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 14)
(Sep 14,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (173rd release)
(Sep 14,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 18)
(Sep 14,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 14)
(Sep 14,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 14)
(Sep 13,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 13)
(Sep 13,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 13)
(Sep 13,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (171st release)
(Sep 13,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 17)
(Sep 13,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 12)
(Sep 13,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (172nd release)
(Sep 13,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on September 12)
(Sep 13,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 13)
(Sep 13,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 13)
(Sep 13,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 13)
(Sep 13,2011)Power Supply to Tohoku Electric Power Company
(Sep 12,2011)Power Supply to Tohoku Electric Power Company
(Sep 12,2011)Application for approval to set new contract category of Lighting Tariff -Subdividing contract category of Fixed-rate Lighting and Public Street Lighting A-
(Sep 12,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 12)
(Sep 12,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 12)
(Sep 12,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 12)
(Sep 12,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 11)
(Sep 12,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (170th release)
(Sep 12,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (171st release)
(Sep 12,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep.12)
(Sep 12,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 12)
(Sep 11,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (169th release)
(Sep 11,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (170th release)
(Sep 11,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 10)
(Sep 11,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 11)
(Sep 11,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 11)
(Sep 11,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 11)
(Sep 11,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 11)
(Sep 11,2011)(Comment) TEPCO President's comments on 11th September, six months after the Tohoku-Chihou-Taiheiyo-Oki Earthquake
(Sep 11,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 11)
(Sep 10,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on September 9)
(Sep 10,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 16)
(Sep 10,2011)Nuclide analysis result of radioactive materials in the seawater collected in the offshore area of Ibaraki Prefecture (continued report 28)
(Sep 10,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 4:00 pm, September 10)
(Sep 10,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 9)
(Sep 10,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (168th release)
(Sep 10,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (169th release)
(Sep 10,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 10)
(Sep 10,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 10)
(Sep 10,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 10)
(Sep 10,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 10)
(Sep 9,2011)Report to NISA in relation to the impact of Tohoku-Chihou Taiheiyo-Oki Earthquake to Nuclear Reactor Facilities at Fukushima Daiichi Nuclear Power Station
(Sep 9,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 9)
(Sep 9,2011)Partial correction to situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station (11th Release)
(Sep 9,2011)A juvenile as of 1993 at work in radiation controlled area
(Sep 9,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 8)
(Sep 9,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (168th release)
(Sep 9,2011)The results of nuclide analyses of radioactive materials in the ocean soil off the coast of Fukushima Daiichi Nuclear Power Station (continued report 15)
(Sep 9,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (167th release)
(Sep 9,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 9)
(Sep 9,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 9)
(Sep 9,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 9)
(Sep 9,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 9)
(Sep 9,2011)(Comment) Lift of Electricity Consumption Restriction per Article 27 of Electricity Business Act
(Sep 8,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 8)
(Sep 8,2011)Enhancement of Medical and Health Management System for the Workers at Fukushima Daiichi Nuclear Power Station - Continuous Operation of Emergency Medical Room and Strengthening of Health Management for the Workers -
(Sep 8,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (167th release)
(Sep 8,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 8)
(Sep 8,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 8)
(Sep 8,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (166th release)
(Sep 8,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 7)
(Sep 8,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on September 7)
(Sep 8,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 8)
(Sep 8,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 8)
(Sep 8,2011)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 8)
(Sep 7,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 6)
(Sep 7,2011)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station(11th Release)
(Sep 7,2011)Change in Personnel
(Sep 7,2011)Change of Executive Officers
(Sep 7,2011)Change of Executive Officers
(Sep 7,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (166th release)
(Sep 7,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (165th release)
(Sep 7,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 7)
(Sep 7,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 7)
(Sep 7,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 7)
(Sep 7,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 7)
(Sep 7,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 7)
(Sep 6,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 6)
(Sep 6,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 5)
(Sep 6,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on September 5)
(Sep 6,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (165th release)
(Sep 6,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (164th release)
(Sep 6,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 6)
(Sep 6,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 6)
(Sep 6,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 6)
(Sep 6,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 9:00 am, Sep. 6)
(Sep 5,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (164th release)
(Sep 5,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 4)
(Sep 5,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 5)
(Sep 5,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 5)
(Sep 5,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 5)
(Sep 5,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 5)
(Sep 5,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 5)
(Sep 4,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 4)
(Sep 4,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 3)
(Sep 4,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (163rd release)
(Sep 4,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 4)
(Sep 4,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 4)
(Sep 4,2011)Tentative Reduction of Supply Capacity due to the Typhoon No. 12 (September 4)
(Sep 4,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 4)
(Sep 4,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 4)
(Sep 3,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 2)
(Sep 3,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on September 2)
(Sep 3,2011)Detection of radioactive materials in the soil in Fukushima Daiichi Nuclear Power Station (31st release)
(Sep 3,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (163rd release)
(Sep 3,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (162nd release)
(Sep 3,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 3)
(Sep 3,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 3)
(Sep 3,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 3)
(Sep 3,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 3)
(Sep 3,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 3)
(Sep 2,2011)Power Supply and Demand Outlook in This Summer and Measures(13th Release)
(Sep 2,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 2)
(Sep 2,2011)Continuous collection of new scientific/technological knowledge on earthquake-proof safety of nuclear power plants and report of the results to the Nuclear and Industrial Safety Agency at the Ministry of Economy, Trade and Industry (Continued Report)
(Sep 2,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on September 1)
(Sep 2,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (161st release)
(Sep 2,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 2)
(Sep 2,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 2)
(Sep 2,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 2)
(Sep 2,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 2)
(Sep 1,2011)Nuclide Analysis Results of Radioactive Materials in the Air at the Site of Fukushima Daiichi Nuclear Power Station (160th release)
(Sep 1,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 1)
(Sep 1,2011)Detection of tiny amount of artificial radioactive materials from environmental samples (pine needles) at the premises of Kashiwazaki-Kariwa Nuclear Power Station
(Sep 1,2011)Detection of Radioactive Materials from Seawater near Fukushima Daiichi Nuclear Power Station (162nd release)
(Sep 1,2011)Nuclide analysis result of radioactive materials in the seawater collected in the offshore area of Ibaraki Prefecture (continued report 27)
(Sep 1,2011)Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (for the data collected on August 31)
(Sep 1,2011)Detection of Radioactive Materials from Subsurface Water near the Turbine Buildings of Fukushima Daiichi Nuclear Power Station (sampling on August 31)
(Sep 1,2011)Plant Status of Fukushima Daini Nuclear Power Station (as of 3:00 pm, September 1)
(Sep 1,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, Sep. 1)
(Sep 1,2011)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 1)
(Sep 1,2011)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 am, September 1)
(Sep 1,2011)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, Sep. 1)