We have been considering water shield walls to prevent further seawater
contamination by underground water, and plan to start construction during
the Step 2 period, as we announced in the press release "Pre-installment
of Water Shield Wall at the Seaside" on August 1, 2011.
We announce that we have put together the basic design of water shield
walls to prevent further seawater contamination by underground water.
We will conduct further study and plan to start construction during the
Step 2 period.
Attachment: Basic Design of Water Shield Wall at the Seaside (PDF 1.10MB)