Due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake which occurred on March
11, 2011, TEPCO's facilities including our nuclear power stations have been
severely damaged. We deeply apologize for the anxiety and inconvenience
caused.
With regard to the accident at Fukushima Daiichi Nuclear Power Station, on
April 17, we have compiled the roadmap towards restoration from the accident
and then we updated the progress status of roadmap considering the current
situation, on July 19. Accomplishment of the Step1 target "Radiation dose
is in steady decline" has been confirmed. On August 17, we updated the
further progress.
By bringing the reactors and spent fuel pools to a stable cooling condition
and mitigating the release of radioactive materials, we will make every
effort to enable evacuees to return to their homes and for all citizens to
be able to secure a sound life.
Below is the status of TEPCO's major facilities.
*Underlined are new items
[Nuclear Power Station]
- Fukushima Daiichi Nuclear Power Station:
Units 1 to 3: shutdown due to the earthquake
(Units 4 to 6: outage due to regular inspections)
* Considering the current balance between the storage capacity of fresh
water and the amount of water injection to reactors, we stopped all of
the evaporative concentration apparatuses of water desalination
facilities at 7:44 pm on September 4, while desalination and water
injection through desalination facilities (reverse osmosis membrane type)
continue.
- Fukushima Daini Nuclear Power Station:
Units 1 to 4: shutdown due to the earthquake
- Kashiwazaki Kariwa Nuclear Power Station:
Units 5, 6: under normal operation
(Units 1 to 4 and 7: outage due to regular inspections)
[Thermal Power Station]
- Power supply has returned to normal and facilities damaged by the
earthquake are now being handled in a timely manner.
[Hydro Power Station]
- Power supply has returned to normal and facilities damaged by the
earthquake are now being handled in a timely manner.
[Impacts on Transmission Facilities]
- Power supply has returned to normal and facilities damaged by the
earthquake are now being handled in a timely manner.
[Perspective of Power Supply and Demand Balance in this Summer]
- In September, we forecast the maximum supply will be 55.6 GW, and the
assumed peak demand 46.06 GW.
We apologize for the inconvenience this may cause and appreciate for your
cooperation to save electricity.
Appendix: Past Progress (As of 9:00 am, September 5, 2011) (PDF 59.2KB)
Appendix: Past Progress (From March 11, 2011 to July 31, 2011) (PDF 225KB)