Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, September 13)
Due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake which occurred on March
11, 2011, TEPCO's facilities including our nuclear power stations have
been severely damaged. We deeply apologize for the anxiety and
inconvenience caused.
With regard to the accident at Fukushima Daiichi Nuclear Power Station, on
April 17, we have compiled the roadmap towards restoration from the
accident and then we updated the progress status of roadmap considering
the current situation, on July 19. Accomplishment of the Step1 target
"Radiation dose is in steady decline" has been confirmed. On August 17,
we updated the further progress. 
By bringing the reactors and spent fuel pools to a stable cooling
condition and mitigating the release of radioactive materials, we will
make every effort to enable evacuees to return to their homes and for all
citizens to be able to secure a sound life.

Below is the status of TEPCO's major facilities.

*Updates are underlined.

[Nuclear Power Station]
-Fukushima Daiichi Nuclear Power Station:
   Units 1 to 3: shutdown due to the earthquake
   (Units 4 to 6: outage due to regular inspections) 

*At 9:35 am on September 13, we stopped transferring accumulated water at
 Unit 2 turbine building vertical shaft to Centralized Radiation Waste
 Treatment Facility (Process Main Building), and at 9:51 am, we started
 transferring accumulated water to Centralized Radiation Waste Treatment
 Facility (Miscellaneous Solid Waste Volume Reduction Treatment Building
 [High Temperature Incinerator Building]).

*Between 10:15 to 11:30 am on September 12, we transferred accumulated
 water from Unit 6 reactor building basement to turbine building.

-Fukushima Daini Nuclear Power Station:
   Units 1 to 4: shutdown due to the earthquake

-Kashiwazaki Kariwa Nuclear Power Station:
   Units 5, 6: under normal operation
   (Units 1 to 4 and 7: outage due to regular inspections)

[Thermal Power Station]
-Power supply has returned to normal and facilities damaged by the
 earthquake are now being handled in a timely manner.

[Hydro Power Station]
-Power supply has returned to normal and facilities damaged by the
 earthquake are now being handled in a timely manner.

[Impacts on Transmission Facilities]
-Power supply has returned to normal and facilities damaged by the
 earthquake are now being handled in a timely manner.

[Perspective of Power Supply and Demand Balance in this summer]
Thanks to our all customer's energy-saving efforts, we could successfully
maintain an even supply-demand balance in this summer. We express our
deepest appreciation to the efforts.

While we will continue to exert maximum effort to stabilize the supply
-demand balance, we kindly request your continued efforts in keeping
electricity consumption within reasonable levels.

Appendix: Past Progress (As of 3:00 pm, September 13, 2011) (PDF 204KB)
Appendix: Past Progress (From March 11, 2011 to July 31, 2011)(PDF 225KB)

* Revised past progress
back to page top