search



Corporate Information

 
|  2018  |  2017  |  2016  |  2015  |  2014  |  2013  |  2012  |  2011  |  2010  |  2009  |  2008  |  2007  |  2006  |  2005  |  2004  |  2003  |  2002  |

| Dec | Nov | Oct | Sep | Aug | Jul | Jun | May | Apr | Mar | Feb | Jan |

(Jul 31,2012)Exposure Dose Evaluation of the Workers at Fukushima Daiichi Nuclear Power Station
(Jul 31,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 31)
(Jul 31,2012)Result of CO2 Emission and CO2 Emission Factor in FY 2011
(Jul 31,2012)(Comment)Acceptance of Our Preferred Stock by the Nuclear Damage Liability Facilitation Fund
(Jul 30,2012)Fuel Cost Adjustment in Electricity Fees for September 2012
(Jul 30,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:30 PM, July 30)
(Jul 30,2012)Report on the Measures Taken Against Radioactive Water Leakage into the Sea Due to the Leakage from the Condensed Water Transfer Pipe Connected to the Condensed Water Storage of Desalination System at Fukushima Daiichi Nuclear Power Station to the Nuclear and Industrial Safety Agency of the Ministry of Economy, Trade and Industry
(Jul 29,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 29)
(Jul 28,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 28)
(Jul 27,2012)Investigation Results of the Oil Leak from the Transformer at the Outdoor Hazardous-material Storage Tank at Fukushima Daiichi Nuclear Power Station
(Jul 27,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake(Daily Report as of 4:00 PM, July 27)
(Jul 27,2012)Receipt of a Directive Document "Storage Status of the Testing Equipments etc. Carried Out of Nuclear Power Station (Direction)" from the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry
(Jul 26,2012)Conclusion of Agreement on Report and Communication with Municipalities in Fukushima Prefecture
(Jul 26,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 26)
(Jul 26,2012)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July 26)
(Jul 26,2012)Financial Support from the Nuclear Damage Liability Facilitation Fund
(Jul 25,2012)Regarding Authorization of Electricity Rate Increase
(Jul 25,2012)Receipt of a Directive Document "Further Measures to Include in the Implementation Plan on Reliability Improvement Measures at Fukushima Daiichi Nuclear Power Station (Direction)" from the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry
(Jul 25,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 25)
(Jul 25,2012)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station (57th Release)
(Jul 25,2012)Notice concerning Change of Payment Date for the Preferred Share Issuance by Third Party Allotment
(Jul 24,2012)Compensation According to the Redefined Evacuation Zone(Within the Evacuation Zone)
(Jul 24,2012)Receipt of a Directive Document "Possibility of APD Misuse by TEPCO Subcontractor at Fukushima Daiichi Nuclear Power Station (Direction)" from the Nuclear and Industrial Safety Agency of the Ministry of Economy, Trade and Industry
(Jul 24,2012)Comment in Response to the Comment from the Ministry of Economy, Trade and Industry Regarding "Compensation Provided According to the Redefined Evacuation Zone" (TEPCO Press Release Issued on July 24)
(Jul 24,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 24)
(Jul 24,2012)Compensation Provided According to the Redefined Evacuation Zone (Former Emergency Evacuation Preparation Zone, etc.)
(Jul 24,2012)Submission of the Revised Report on the "Establishment of an Implementation Plan on Reliability Improvement Measures at Fukushima Daiichi Nuclear Power Station" to the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry
(Jul 23,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 23)
(Jul 22,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 22)
(Jul 21,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 21)
(Jul 21,2012)Fuel Oil (Gas Oil) Leakage from the Diesel Generator for the Spare Nitrogen Supply Equipment at Fukushima Daiichi Nuclear Power Station (Follow-up Report)
(Jul 20,2012)Fuel Oil (Gas Oil) Leakage from the Diesel Generator for the Spare Nitrogen Supply Equipment at Fukushima Daiichi Nuclear Power Station
(Jul 20,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 20)
(Jul 20,2012)(Comment)Assessment Policy for Electricity Rate Raise
(Jul 19,2012)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July 19)
(Jul 19,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 19)
(Jul 19,2012)Operational Commencement of Unit 7-3 at Kashima Thermal Power Station
(Jul 18,2012)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station (56th Release)
(Jul 18,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 4:00 PM, July 18)
(Jul 17,2012)Postponement of the Report Due Dates for the Instructions from NISA of the Ministry of Economy, Trade and Industry
(Jul 17,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 17)
(Jul 17,2012)Revision to the Technical Specification for the Nuclear Reactor Facility at Fukushima Daiichi Nuclear Power Station
(Jul 16,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 16)
(Jul 15,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 15)
(Jul 14,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 14)
(Jul 13,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 13)
(Jul 12,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 12)
(Jul 12,2012)Revision to the Technical Specification for the Nuclear Reactor Facility at Fukushima Daiichi Nuclear Power Station
(Jul 12,2012)Operational Commencement of Unit 7-1 at Kashima Thermal Power Station
(Jul 12,2012)Change to the Report on Our Facility Management Plan for Unit 1-4 of Fukushima Daiichi Nuclear Power Station Based on the "Policy on the Mid-term Security" (Version 3, Revised)
(Jul 12,2012)Operation Suspended at Unit 2 of Kashima Thermal Power Station
(Jul 12,2012)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July12)
(Jul 12,2012)Result of the Request for Comments on the Specification of Smart Meters and Our "Basic Concept"
(Jul 11,2012)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station (55th Release)
(Jul 11,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 11)
(Jul 10,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 10)
(Jul 10,2012)Operational Commencement of Unit 3-3 at Chiba Thermal Power Station
(Jul 9,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 9)
(Jul 8,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 8)
(Jul 7,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 7)
(Jul 6,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 6)
(Jul 6,2012)(Comment)Regarding the case of our inappropriate treatment at the Nuclear Damage Compensation Dispute Resolution Centre
(Jul 5,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 5)
(Jul 5,2012)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July 5)
(Jul 4,2012)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station (54th Release)
(Jul 4,2012)Revision to the Report on Our Facility Management Plan for Unit 1-4 of Fukushima Daiichi Nuclear Power Station Based on the "Policy on the Mid-term Security" (Version 2, Revised edition 2)
(Jul 4,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 4)
(Jul 3,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 4:00 PM, July 3)
(Jul 3,2012)Approval Given to the Revised Technical Specification for the Nuclear Reactor Facility at Fukushima Daiichi Nuclear Power Station
(Jul 3,2012)Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan(Monthly Report: June 2012)
(Jul 2,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:00 PM, July 2)
(Jul 2,2012)Reliability Evaluation of the Thermometers Used in the Reactor and the Primary Containment Vessel at Fukushima Daiichi Nuclear Power Station Unit 1-3 (Submitted in July 2012)
(Jul 1,2012)Status of TEPCO's Nuclear Power Stations after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (Daily Report as of 3:30 PM, July 1)
back to page top


to TOP