Pumping Up Groundwater from Groundwater Drains
To reduce the volume of contaminated water, which increases when groundwater flows into reactor buildings or other contamination sources, groundwater drains were installed, in line with the policy of not allowing contaminated waterion sources to leak. In this undertaking, first of all groundwater that has been dammed up by means of an ocean-side impermeable wall is pumped up from the groundwater drains. The pumped-up groundwater undergoes decontamination treatment, and after being confirmed to meet national effluent standards, is discharged into the ocean, reducing the amount of groundwater coming into proximity with the reactor buildings, etc.
Overview of Groundwater Drains
Overall view of groundwater drains
Cross-section view of groundwater drain
Steps from pumping up to discharge
- *1 Special decontamination equipment is capable of reducing the levels of radioactive materials (other than tritium) to around 1/1,000 to 1/10,000.
- *2 TEPCO and third-party agents confirm that the water meets operational targets that are even stricter than the targets (water quality standards) set for the groundwater bypass.
- *3 This will not be done without obtaining the understanding of relevant ministries and agencies and of fishery industry stakeholders.
Decontamination process and analysis standards
Decontamination treatment reduces levels of cesium and strontium in two stages.
The resulting water is analyzed to confirm that levels of Cs-134, Cs-137, all beta emitters (strontium, etc.), and tritium are within operational targets, and that other gamma emitters are not detected, before the water is discharged.
*4 If cesium or all beta are above operational targets, the water is returned for further decontamination treatment.
If the level of tritium in water collection tanks before decontamination is above operational targets, it is managed to prevent highly contaminated water from being released into the ocean, normally by transferring it to tanks on the power station site.
Status of groundwater drain sampling
Regular radioactivity analysis is performed on transfer tanks holding pumped-up water and temporarily storage tanks containing water after decontamination. To determine the impact on the maritime environment, radiation levels are also measured at the time of discharge and in the bay and other areas around the power station.