Thermal Power Station

Print

As of the end of 2018

Station name Location Maximun
Output
(MW)
Unit No. Single unit capacity
(MW)
Start of operation Designed thermal efficiency
(%) (LHV)
Type
(*3)
Fuel in use
Chiba 2-1377 Soga-cho, Chuo-ku, Chiba, Chiba Pref. 4,380 Group 1
Unit 1-1 ~ Unit 1-4
360 × 4 Apr-2000 54.2 ACC LNG
Group 2
Unit 2-1 ~ Unit 2-4
360 × 4 Jun-2000
Group 3
Unit 3-1 ~ Unit 3-2
500 × 3 Jul-2014 57.3 MACC
Group 3
Unit 3-3
57.7
Anegasaki 3 Anegasaki Kaigan, Ichihara, Chiba Pref. 3,600 Unit 1 600 Dec-1967 42.7 Steam power Heavy oil
Crude oil
NGL
LNG
LPG
Unit 2 600 Nov-1969
Unit 3 600 Jun-1971
Unit 4 600 Sep-1972
Unit 5 600 Apr-1977 43.0
Unit 6 600 Oct-1979
Sodegaura 2-1 Nakasode, Sodegaura, Chiba Pref. 3,600 Unit 1 600 Aug-1974 43.0 Steam power LNG
Unit 2 1,000 Sep-1975 43.5
Unit 3 1,000 Feb-1977
Unit 4 1,000 Aug-1979
Futtsu 25 Shintomi, Futtsu, Chiba Pref. 5,160 Group 1
Unit 1-5,Unit 1-7
165 × 2 Nov-1986 47.2 CC LNG
Group 1
Unit 1-1,Unit 1-3,Unit 1-6
167 × 3 51.4
Group 1
Unit 1-2,Unit 1-4
160 × 2 50.5
Group 2
Unit 2-3
165 × 1 Nov-1988 47.2
Group 2
Unit 2-1 ,Unit 2-2,Unit 2-4,Unit 2-5,Unit 2-7
160 × 4 Nov-1988 54.3
Group 2
Unit 2-6
162 × 1 Nov-1988 54.4
Group 3
Unit 3-1 ~ Unit 3-4
380 × 4 Nov-2003 55.3
Group 4
Unit 4-1 ~ Unit 4-3
507 × 3 Oct-2010 58.6 MACC
Kawasaki 5-1 Chidori-cho, Kawasaki-ku, Kawasaki, Kanagawa Pref. 3,420 Group 1
Unit 1-1 ~ Unit 1-3
500 × 3 Feb-2009 58.6 MACC LNG
Group 2
Unit 2-1
500 Feb-2013
Group 2
Unit 2-2(*2)
710 June-2016 Approx. 61
Group 2
Unit 2-3(*2)
710 June-2016 Approx. 61
Yokohama(*1) 11-1 Daikoku-cho, Tsurumi-ku, Yokohama, Kanagawa Pref. 3,460 Unit 5 175 Mar-1964 41.6 Steam power Heavy oil
Crude oil
NGL
LNG
Unit 6 350 Jun-1968 42.2
Group 7
Unit 7-3
350 Jan-1998 54.1 ACC
Group 7
Unit 7-1, Unit 7-2, Unit 7-4
377 × 3 Jan-1998 55.8
Group 8
Unit 8-1 ,Unit 8-2
350 × 2 Jan-1998 54.1
Group 8
Unit 8-3, Unit 8-4
377 × 2 Jan-1998 55.8
Minami Yokohama 37-1 Shin Isogo-cho, Isogo-ku, Yokohama, Kanagawa Pref. 1,150 Unit 1 350 May-1970 42.4 Steam power LNG
Unit 2 350 Apr-1970
Unit 3 450 May-1973
Higashi Ohgishima 3 Higashi Ohgishima, Kawasaki-ku, Kawasaki, Kanagawa Pref. 2,000 Unit 1 1,000 Sep-1987 44.6 Steam power LNG
Unit 2 1,000 Mar-1991 44.7
Kashima(*1) 9 Higashi Wada, Kamisu, Ibaraki Pref. 5,660 Unit 1 600 Mar-1971 42.7 Steam power Heavy oil
Crude oil
Unit 2 600 Sep-1971
Unit 3 600 Feb-1972
Unit 4 600 Apr-1972
Unit 5 1,000 Sep-1974 43.2
Unit 6 1,000 Jun-1975
Group 7
Unit 7-1 ~ Unit 7-3
420 × 3 Jun-2014 57.2 ACC (City gas)
Ohi(*1) 1-2-2 Yashio, Shinagawa-ku, Tokyo 1,050 Unit 1 350 Aug-1971 42.2 Steam power Crude oil
Unit 2 350 Feb-1972
Unit 3 350 Dec-1973
Hirono 58 Futatsu Numa, Shimokitaba,
Hirono-machi, Futaba-gun, Fukushima Pref.
4,400 Unit 1 600 Apr-1980 43.1 Steam power Heavy oil
Crude oil
Unit 2 600 Jul-1980
Unit 3 1,000 Jun-1989 44.3
Unit 4 1,000 Jan-1993 44.2
Unit 5 600 Jul-2004 45.2 Coal
Unit 6 600 Dec-2013
Shinagawa 5-6-22 Higashi Shinagawa, Shinagawa-ku, Tokyo 1,140 Group 1
Unit 1-1 ~ Unit 1-3
380 × 3 Aug-2003 55.3 ACC City gas
Hitachinaka 768-23 Terunuma,
Tokai-mura, Naka-gun, Ibaraki Pref.
2,000 Unit 1 1,000 Dec-2003 45.2 Steam power Coal
Woody biomass
Unit 2 1,000 Dec-2013

(*Notes)

  1. As of March 2019, the following thermal power stations are off-line as planned for a long term: Yokohama (Units 5-6), Kashima (Units 1-4), Ohi (Units 1-3) and Hirono (Unit 1,3-4).
  2. Generation Type
    Steam power: Steam power generation
    GT: Gas turbine generation
    CC: 1,100℃ class combined cycle generation
    ACC: 1,300℃ class combined cycle generation
    MACC: 1,500℃ class combined cycle generation
    MACCⅡ: 1,600℃ class combined cycle generation