Power Generation Facilities (authorized capacity)

Print

As of the end of FY2015

At the end of FY Hydro Thermal Nuclear New Energy, etc Total
Established
(May 1,1951)
Number of location 242 9 - - 251
Authorized capacity(GW) 1.44 0.35 - - 1.79
Percentage composition(%) 80.7 19.3 - - 100
1955 Number of location 230 11 - - 241
Authorized capacity(GW) 1.64 0.81 - - 2.44
Percentage composition(%) 66.8 33 - - 100
1965 Number of location 222 16 - - 238
Authorized capacity(GW) 2.10 6.00 - - 8.10
Percentage composition(%) 25.9 74.1 - - 100
1975 Number of location 185 26 1 - 212
Authorized capacity(GW) 3.19 19.37 2.03 - 24.59
Percentage composition(%) 13 78.8 8.2 - 100
1985 Number of location 155 28 3 - 186
Authorized capacity(GW) 5.07 23.43 9.10 - 37.59
Percentage composition(%) 13.5 62.3 24.2 - 100
1995 Number of location 155 25 3 - 183
Authorized capacity(GW) 7.63 28.98 14.60 - 51.21
Percentage composition(%) 14.9 56.6 28.5 - 100
2000 Number of location 160 24 3 1 188
Authorized capacity(GW) 8.508 33.026 17.308 0.001 58.843
Percentage composition(%) 14.5 56.1 29.4 0 100
2002 Number of location 160 25 3 1 189
Authorized capacity(GW) 8.520 34.548 17.308 0.001 60.377
Percentage composition(%) 14.1 57.2 28.7 0 100
2003 Number of location 160 26 3 1 190
Authorized capacity(GW) 8.520 36.831 17.308 0.001 62.660
Percentage composition(%) 13.6 58.8 27.6 0 100
2004 Number of location 160 26 3 1 190
Authorized capacity(GW) 8.521 36,995 17.308 0.001 62.825
Percentage composition(%) 13.6 58.9 27.5 0 100
2005 Number of location 161 26 3 1 191
Authorized capacity(GW) 8.993 35.536 17.308 0.001 61.837
Percentage composition(%) 14.5 57.5 28.0 0 100
2006 Number of location 161 26 3 1 191
Authorized capacity(GW) 8.993 35.533 17.308 0.001 61.835
Percentage composition(%) 14.5 57.5 28.0 0 100
2007 Number of location 160 26 3 1 190
Authorized capacity(GW) 8.985 36.179 17.308 0.001 62.473
Percentage composition(%) 14.4 57.9 27.7 0 100
2008 Number of location 160 26 3 1 190
Authorized capacity(GW) 8.986 37.686 17.308 0.001 63.981
Percentage composition(%) 14.0 58.9 27.1 0 100
2009 Number of location 160 25 3 2 190
Authorized capacity(GW) 8.987 38.189 17.308 0.004 64.487
Percentage composition(%) 13.9 59.2 26.8 0 100
2010 Number of location 162 25 3 2 192
Authorized capacity(GW) 8.981 38.696 17.308 0.004 64.988
Percentage composition(%) 13.8 59.5 26.6 0 100
2011 Number of location 163 25 3 5 196
Authorized capacity(GW) 8.982 40.148 17.308
(*4)
0.034 66.472
Percentage composition(%) 13.5 60.4 26.0 0.1 100
2012 Number of location 164 25 3 7 199
Authorized capacity(GW) 9.454 41.598 14.496
(*4)
0.034 65.582
Percentage composition(%) 14.4 63.4 22.1 0.1 100
2013 Number of location 164 25 2 4 195
Authorized capacity(GW) 9.456 42.945 12.612 0.033 65.046
Percentage composition(%) 14.5 66.0 19.4 0.1 100
2014 Number of location 164 25 2 4 195
Authorized capacity(GW) 9.8573 43.555 12.612 0.033 66.057
Percentage composition(%) 14.9 65.9 19.1 0.0 100
2015 Number of location 164 25 2 5 196
Authorized capacity(GW) 9.859 44.323 12.612 0.052 66.845
Percentage composition(%) 14.7 66.3 18.9 0.1 100
Total of 10 EP companies
2015
Number of location 1,207 159 14 44 1,424
Authorized capacity(GW) 37.215 131.948 39.788 0.586 209.537
Percentage composition(%) 17.8 63.0 19.0 0.3 100

(Note)

  1. The figures before FY2008 for thermal power include geothermal power.
  2. Totals in the table may not agree with the sums of each column because of being rounded off.
  3. The figures for new energy, etc. consist of wind, photovoltanic and waste power generation before FY2008 (facilities with expected supply capacity and TEPCO's approved facilities).The figures in FY2009 added geothermal and biomass power generation (fac
  4. Following the notification of decomissioning submitted in accordance with Article 9 of the Electric Utilities Industry Law, Unit 1-6 (4.696 GW) of Fukushima Daiichi Nuclear Power Station were granted to be decommissioned before January 31, 2014.