TEPCO has accomplished stable and reliable power system to achieve high quality
power supply. To realize the well-balance performance, TEPCO improves protection
performance, develops various protection systems and uses appropriate controller
etc.
For system reliability improvement, planned outage duration due to distribution
network construction should be reduced. As stated above, if a switch-over
of the distribution network grid can be realized by distribution system improvement,
planned outage can be avoided. Moreover, TEPCO has adopted the "live
line work method", "non-outage work method by by-passing switch
and cable" and "temporary transformer for construction work method" for
planned outage avoidance. By using these methods, we have achieved to reduce
in the duration time of planned outage, and have therefore, improved our system
reliabilities.
TEPCO does consultancy services on "Planned Outage Reduction
Measures" by using our experiences and achievements for higher reliability
realization.