search


About this website

Monitoring by sampling

Result of Radioactive Analysis around Fukushima Daiichi Nuclear Power Station

Results of radioactive nuclide analysis are published for the sample for below items in the power station and its surrounding area.
* During weekends and national holidays, updates will be provided in Japanese only.

Prompt Report of Result of Analysis (June, 2014)

in the Air at the Site of Power Station

Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          

Result of radioactive nuclide analysis for the air sampled in the power station.

Seawater near Power Station

Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          

Result of radioactive nuclide analysis for the seawater sampled on and offshore of the power station.

in Seawater taken near Intake Canal of Power Station

Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          

Result of radioactive nuclide analysis for the seawater sampled at near the intake canal of unit 1 to 4 of the power station.

Subsurface Water near the Turbine Buildings

Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          

Result of radioactive nuclide analysis for the water sampled from the sub drain around turbine buildings of unit 1 to 6.

Sub-drain Water in the Surroundings of Centralized Radiation Waste Treatment Facility

Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          

Result of radioactive nuclide analysis for the water sampled from the sub drain around centralized waste treatment facility.

Additional Sampling Results of Sub-drain Water on East Side of Incineration Workshop Building

June 12, 2014 Additional Sampling Results of Subdrained Water on East Side of Incineration Workshop Building
June 11, 2014 Additional Sampling Results of Subdrained Water on East Side of Incineration Workshop Building
June 10, 2014 Additional Sampling Results of Subdrained Water on East Side of Incineration Workshop Building

+ Display and non-display of article in the past

Monitoring at the East Side of Unit 1-4 Turbine Buildings

June 30, 2014 Detailed Analysis Results in the Port of Fukushima Daiichi NPS, around Discharge Channel and Bank Protection
June 28, 2014 Detailed Analysis Results in the Port of Fukushima Daiichi NPS, around Discharge Channel and Bank Protection
June 27, 2014 Detailed Analysis Results in the Port of Fukushima Daiichi NPS, around Discharge Channel and Bank Protection

+ Display and non-display of article in the past

Results of radioactive nuclide analysis are published for the samples of groundwater at the east side of Unit 1-4 Turbine Buildings and seawater at the port in order to monitor the source and the extent of the radioactive materials in the groundwater, and whether the materials included in groundwater affect the sea.

Monitoring Regarding the Water Leak at Tank (South Water Outlet, Drainage Channel)

June 30, 2014 Sampling Results Regarding the Water Leak at the Tanks in the H4 area in Fukushima Daiichi Nuclear Power Station (South Water Outlet, Drainage Channel)
June 29, 2014 Sampling Results Regarding the Water Leak at the Tanks in the H4 area in Fukushima Daiichi Nuclear Power Station (South Water Outlet, Drainage Channel)
June 28, 2014 Sampling Results Regarding the Water Leak at the Tanks in the H4 area in Fukushima Daiichi Nuclear Power Station (South Water Outlet, Drainage Channel)

+ Display and non-display of article in the past

Monitoring Regarding the Water Leak at Tank (Observation Hole around the H4 Area)

June 30, 2014 Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area)
June 29, 2014 Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area)
June 28, 2014 Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area)

+ Display and non-display of article in the past

Investigation of Impact on the Groundwater Bypass Regarding the Water Leak at Tank (Pump Well)

June 28, 2014 Sampling Results of Pump Wells of the Groundwater Bypass at Fukushima Daiichi Nuclear Power Station
June 25, 2014 Sampling Result of Pump Well No.12 of the Groundwater Bypass at Fukushima Daiichi NPS
June 25, 2014 Sampling Results of Pump Wells of the Groundwater Bypass at Fukushima Daiichi Nuclear Power Station

+ Display and non-display of article in the past

Monitoring Regarding the Water Leak at Tank (Observation Hole around the H6 Area)

June 30, 2014 Sampling Results Regarding the Influence on the Water Leak at a Tank in the H6 area in Fukushima Daiichi Nuclear Power Station (Around the H6 Area)
June 29, 2014 Sampling Results Regarding the Influence on the Water Leak at a Tank in the H6 area in Fukushima Daiichi Nuclear Power Station (Around the H6 Area)
June 28, 2014 Sampling Results Regarding the Influence on the Water Leak at a Tank in the H6 area in Fukushima Daiichi Nuclear Power Station (Around the H6 Area)

+ Display and non-display of article in the past

Analysis Results of Rainwater Obtained Inside the Dike at the Tank Area After Treated by the Rainwater Treatment System

June 28, 2014 Radioactive Material Density in the Air at the Place Where Rainwater Obtained Inside the Dike at the Tank Area After Treated by the Rainwater Treatment System is Sprinkled and Ambient Dose Rate at theSurrounding Area
June 28, 2014 Analysis Results of Rainwater Obtained Inside the Dike at the Tank Area After Treated by the Rainwater Treatment System
June 27, 2014 Radioactive Material Density in the Air at the Place Where Rainwater Obtained Inside the Dike at the Tank Area After Treated by the Rainwater Treatment System is Sprinkled and Ambient Dose Rate at theSurrounding Area

+ Display and non-display of article in the past

Detailed Analysis Results of Groundwater Obtained around Unit 1 to 4

June 23, 2014 Detailed Analysis Results of Groundwater Obtained around Unit 1-4 Building at Fukushima Daiichi Nuclear Power Station
June 13, 2014 Detailed Analysis Results of Groundwater Obtained around Unit 1-4 Building at Fukushima Daiichi Nuclear Power Station
June 6, 2014 Detailed Analysis Results of Groundwater Obtained around Unit 1-4 Building at Fukushima Daiichi Nuclear Power Station

Radioactive material was detected from the accumulated water inside the pit as a result of purification test at a well (sub-drain pit), which is adjacent to Unit 1-4 Buildings at Fukushima Daiichi Nuclear Power Station. Since there is a possibility that the water was affected by fallout, we installed new observation well around Unit 1-4 Buildings in order to assess the impact of fallout.

Nuclide Analysis Results of the Underground Reservoirs

June 30, 2014 Underground Reservoir Nuclide Analysis Results (As of June 29)
June 29, 2014 Underground Reservoir Nuclide Analysis Results (As of June 28)
June 28, 2014 Underground Reservoir Nuclide Analysis Results (As of June 27)

+ Display and non-display of article in the past

Other

June 30, 2014 Sampling Results Regarding the Discharge of Groundwater Bypass at Fukushima Daiichi Nuclear Power Station (Around South Water Outlet)
June 27, 2014 in the soil in the ocean soil off the coast
June 25, 2014 Seawater collected in offshore area of Ibaraki Prefecture Seawater collected in offshore area of Miyagi Prefecture
June 24, 2014 Nuclide Analysis Results of Radioactive Materials in Accumulated Water in Turbine Building Basement at Fukushima Daiichi NPS
June 23, 2014 Sampling Results Regarding the Discharge of Groundwater Bypass at Fukushima Daiichi Nuclear Power Station (Around South Water Outlet)
June 20, 2014 Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 1 Reactor Building (1) Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 1 Reactor Building (2) Analysis results of radioactive material nuclide in the air at Ventilation facility of Unit 2 reactor building in Fukushima Daiichi Nuclear Power Station Gas Sampling Results of Unit 1 PCV Gas Control System Conducted at Fukushima Daiichi Nuclear Power Station Gas Sampling Results of Unit 2 PCV Gas Control System Conducted at Fukushima Daiichi Nuclear Power Station Gas Sampling Results of Unit 3 PCV Gas Control System Conducted at Fukushima Daiichi Nuclear Power Station Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 3 Reactor Building Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 4 Reactor Building Nuclides Analysis Result of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS (1) Nuclides Analysis Result of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS (2) Nuclides Analysis Result of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS (3) Nuclides Analysis Results of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS Nuclide Analysis of the Radioactive Materials in the Fallouts obtained inside and outside of Fukushima Daiichi Nuclear Power Station Seawater collected in offshore area of Ibaraki and Miyagi Prefecture
June 19, 2014 Anaysis results of temporary storage tanks for groudwater bypass at Fukushima Daiichi Nuclear Power Station in the ocean soil off the coast (Dry Soil Rate : May 2014)
June 18, 2014 Seawater collected in offshore area of Miyagi Prefecture
June 16, 2014 Sampling Results Regarding the Discharge of Groundwater Bypass at Fukushima Daiichi Nuclear Power Station (Around South Water Outlet)
June 13, 2014 Anaysis Results of Temporary Storage Tanks for Groudwater Bypass at Fukushima Daiichi Nuclear Power Station
June 11, 2014 Seawater collected in offshore area of Ibaraki Prefecture
June 10, 2014 Sampling Results Regarding the Discharge of Groundwater Bypass at Fukushima Daiichi Nuclear Power Station (Around South Water Outlet)
June 7, 2014 Anaysis Results of Temporary Storage Tanks for Groudwater Bypass at Fukushima Daiichi Nuclear Power Station
June 6, 2014 Detailed Anaysis Results of Temporary Storage Tanks for Groudwater Bypass at Fukushima Daiichi Nuclear Power Station
June 4, 2014 Sampling Results Regarding the Discharge of Groundwater Bypass at Fukushima Daiichi Nuclear Power Station (Around South Water Outlet) (Revised Version)
June 3, 2014 in the soil

Confirmed Results of Analysis

Analysis results of the major 3 nuclides (I-131, Cs-134, Cs-137) are being announced as flash report on a daily basis.
With regard to reevaluation of the major 3 nuclides and analysis results of γ nuclides except for the major 3 nuclides are being announced as definite report.

June 24, 2014 For updated from May 16 to May 31
June 6, 2014 For updated from May 1 to May 15

Seawater taken from Unit 1 to 4 side of South Discharge Channel (June, 2014)

Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          

Nuclide analysis is in operation on the radioactive materials in the water sampled near the South Discharge Channel (approximately 330m south of Unit 1-4 side of the South Discharge Channel) in response to the leaked water from the pipeline connecting from Desalination System (Reverse Osmosis Membrane) to Concentrated Water Storage Tank (occurred on March 26 and April 5, 2012).

* The sampling location has been changed on November 26, 2012. (Sampling is performed at approx. 1km south of the previous location.)

Analysis Results of Fish and Shellfish(The Ocean Area Within 20km Radius of Fukushima Daiichi NPS)

June 13, 2014 Investigation Report of Fish and Shellfish Sampled in the Ocean Area Within 20km Radius of Fukushima Daiichi NPS   Sampled in FY 2013 Q4