Result of Radioactive Analysis around Fukushima Daiichi Nuclear Power Station
Results of radioactive nuclide analysis are published for the sample for below items in the power station and its surrounding area.
* Only Japanese for holidays and weekends
Prompt Report of Result of Analysis (November, 2013)
in the Air at the Site of Power Station
Result of radioactive nuclide analysis for the air sampled in the power station.
Seawater near Power Station
Result of radioactive nuclide analysis for the seawater sampled on and offshore of the power station.
in Seawater taken near Intake Canal of Power Station
Result of radioactive nuclide analysis for the seawater sampled at near the intake canal of unit 1 to 4 of the power station.
Subsurface Water near the Turbine Buildings
Result of radioactive nuclide analysis for the water sampled from the sub drain around turbine buildings of unit 1 to 6.
Sub-drain Water in the Surroundings of Centralized Radiation Waste Treatment Facility
Result of radioactive nuclide analysis for the water sampled from the sub drain around centralized waste treatment facility.
Monitoring at the East Side of Unit 1-4 Turbine Buildings
- November 29, 2013
- Detailed Analysis Results in the Port of Fukushima Daiichi NPS, around Discharge Channel and Bank Protection
- November 28, 2013
- Detailed Analysis Results in the Port of Fukushima Daiichi NPS, around Discharge Channel and Bank Protection
- November 27, 2013
- Detailed Analysis Results in the Port of Fukushima Daiichi NPS, around Discharge Channel and Bank Protection
Display and non-display of article in the past
Results of radioactive nuclide analysis are published for the samples of groundwater at the east side of Unit 1-4 Turbine Buildings and seawater at the port in order to monitor the source and the extent of the radioactive materials in the groundwater, and whether the materials included in groundwater affect the sea.
Monitoring Regarding the Water Leak at Tank (South Water Outlet, Drainage Channel)
- November 30, 2013
- Sampling Results Regarding the Water Leak at the Tanks in the H4 area and the B area in Fukushima Daiichi Nuclear Power Station (South Water Outlet, Drainage Channel)
- November 29, 2013
- Sampling Results Regarding the Water Leak at the Tanks in the H4 area and the B area in Fukushima Daiichi Nuclear Power Station (South Water Outlet, Drainage Channel)
- November 28, 2013
- Sampling Results Regarding the Water Leak at the Tanks in the H4 area and the B area in Fukushima Daiichi Nuclear Power Station (South Water Outlet, Drainage Channel)
Display and non-display of article in the past
Monitoring Regarding the Water Leak at Tank (Observation Hole around the H4 Area)
- November 30, 2013
- Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area)
- November 29, 2013
- Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area)
- November 28, 2013
- Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area)
Display and non-display of article in the past
Investigation of Impact on the Groundwater Bypass Regarding the Water Leak at Tank (Pump Well)
- November 28, 2013
- Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Pump Well)
- November 21, 2013
- Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Pump Well)
- November 14, 2013
- Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Pump Well)
Display and non-display of article in the past
Nuclide Analysis Results of the Underground Reservoirs
- November 30, 2013
- Nuclide Analysis Results of the Underground Reservoirs/Underground Reservoirs Observation Holes (As of November 29)
- November 29, 2013
- Nuclide Analysis Results of the Underground Reservoirs/Underground Reservoirs Observation Holes (As of November 28)
- November 28, 2013
- Underground Reservoir Tritium Analysis Results (As of November 20)
Display and non-display of article in the past
Other
- November 27, 2013
- Nuclides Analysis Result of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS(2)
- Nuclides Analysis Result of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS(1)
- Gas Sampling Results of Unit 3 PCV Gas Control System Conducted at Fukushima Daiichi Nuclear Power Station
- Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 4 Reactor Building
- Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 3 Reactor Building
- Nuclide Analysis of the Radioactive Materials in the Fallouts obtained inside and outside of Fukushima Daiichi Nuclear Power Station
- November 25, 2013
- Nuclide Analysis Results of Radioactive Materials in Accumulated Water in Turbine Building Basement at Fukushima Daiichi NPS
- November 13, 2013
- Nuclides Analysis Result of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS
- Nuclides Analysis Results of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS
- Gas Sampling Results of Unit 1 PCV Gas Control System Conducted at Fukushima Daiichi Nuclear Power Station
- Gas Sampling Results of Unit 2 PCV Gas Control System Conducted at Fukushima Daiichi Nuclear Power Station
- Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 1 Reactor Building
- Nuclides Analysis Result of the Radioactive Materials in the Air at the Exhaust System of the Unit 2 Reactor Building
- November 12, 2013
- Seawater collected in offshore area of Ibaraki Prefecture
- Measurement Results of the Seawater Sampled at Yotsukura Beach and Nakoso Beach
Confirmed Results of Analysis
Analysis results of the major 3 nuclides (I-131, Cs-134, Cs-137) are being announced as flash report on a daily basis.
With regard to reevaluation of the major 3 nuclides and analysis results of γ nuclides except for the major 3 nuclides are being announced as definite report.
- November 1, 2013
- For updated from August 16 to August 31
Seawater taken from Unit 1 to 4 side of South Discharge Channel (November, 2013)
Nuclide analysis is in operation on the radioactive materials in the water sampled near the South Discharge Channel (approximately 330m south of Unit 1-4 side of the South Discharge Channel) in response to the leaked water from the pipeline connecting from Desalination System (Reverse Osmosis Membrane) to Concentrated Water Storage Tank (occurred on March 26 and April 5, 2012).
* The sampling location has been changed on November 26, 2012. (Sampling is performed at approx. 1km south of the previous location.)
Analysis Results of Water at Water Treatment Facility
- November 20, 2013
- Measurement results of radioactive density of water at water treatment facility
Analysis Results of Fish and Shellfish(The Ocean Area Within 20km Radius of Fukushima Daiichi NPS)
- November 20, 2013
- Nuclide Analysis Results of Fish and Shellfish (In the port of Fukushima Daiichi NPS)
- Nuclide Analysis Results of Fish and Shellfish (The Ocean Area Within 20km Radius of Fukushima Daiichi NPS) (Exclude in the port of Fukushima Daiichi NPS)
- Acrobat® Reader In Order to view the PDF documents, you will need a software product called Adobe® Acrobat® Reader installed on your computer. You can download this software product for free from Adobe's Web site by clicking the left button:
The recent data is here.