Results of Analysis (September, 2017)
Air
* Radioactive nuclide analysis for the air sampled on the west gate of the nuclear plant, 3 points near the site boundary (MP-1,3,8), 3 points around Unit 1-4 (Unit 1 north side slope, Unit 1-2 west side slope, Unit 3-4 west side slope) and the sea side area near Unit 1-4 are discontinued after August 30, 2017. Monitoring with the continuous dust monitors already installed at the site has been implemented.
<Reference: Radioactive Concentration measured at Dust Monitors near the Site Boundary of Fukushima Daiichi Nuclear Power Station>
http://www.tepco.co.jp/en/nu/fukushima-np/f1/dustmonitor/index-e.html
* Analysis of Strontium and Plutonium in the air are continuously carried out every six months (April and October) by the monitoring car at the west gate of the nuclear plant.
Seawater
Seawater near Power Station
English form
Result of radioactive nuclide analysis for the seawater sampled onshore and offshore of the power station.
Seawater near Intake Canals by Unit 1-4 side
English form
Result of radioactive nuclide analysis for the seawater sampled near the intake canals by the side of Unit 1-4 turbine buildings.
Leaked Water near South Discharge Cannel on Unit 1-4 side
English form
- *The sampling location has been changed on November 26, 2012. (Sampling is performed at approx. 1km south of the previous location.)
Result of radioactive nuclide analysis for the water sampled near the South Discharge Channel (approximately 280m south of the South Discharge Channel on Unit 1-4 side) in response to the leaked water from the pipeline connecting from Desalination System (Reverse Osmosis Membrane) to Concentrated Water Storage Tank (occurred on March 26 and April 5, 2012).
Seawater at Port Entrance
(measurement by radiation monitor)
Real-time data which are updated every 10 minutes started to be published from October 1, 2016.
Subdrain Water
Subdrain Water near the Turbine Buildings
English form
Result of radioactive nuclide analysis for the water sampled from the subdrain system near Unit 1-6 turbine buildings.
Subdrain Water around Centralized Radiation Waste Treatment Facility
English form
Result of radioactive nuclide analysis for the water sampled from the subdrain around the centralized waste treatment facility.
Sampling from Subdrain and Groundwater Drain
The subdrain and groundwater drain systems started operations from September 2015. The subdrain system (a measure to prevent the increase of contaminated water) pumps up groundwater from around the reactor buildings before it flows into them. The groundwater drain system (a measure to prevent the leakage of contaminated water) pumps up groundwater held back by the installed seaside impermeable wall before it flows into the port area. The water pumped by either system is purified, tested, and then discharged into the port area.
It is then stored in temporary storage tanks and the radioactive concentration is measured to confirm that the water quality does not surpass the upper limits set by TEPCO.
Third-party organizations also analyze the radioactive concentration to ensure the objectivity of the analysis results.
|
Cesium 134 |
Cesium 137 |
Gross β |
Strontium |
Tritium |
TEPCO's upper limit of radioactive concentration for temporary storage tanks |
1Bq/l |
1Bq/l |
3Bq/l |
- |
1500Bq/l |
Regulatory Notification Limit (for reference) |
60Bq/l |
90Bq/l |
- |
30Bq/l |
60000Bq/l |
WHO Guideline for Drinking Water |
10Bq/l |
10Bq/l |
- |
10Bq/l |
10000Bq/l |
Related materials about the activities and current operational status of Subdrain and Groundwater drain can be found HERE.
Analysis Results of Relay Tanks
English form
The newest data is on June 14, 2016.
Analysis Results of Temporary Storage Tanks and Water Collecting Tanks
English form
Analysis Results of Weighted Average Sampling
*The analysis of the water sampled before being discharged, which is mixed at the rate of each amount out of the whole amount of discharged water in a month.
Analysis Results Regarding Discharge
English form
Sampling regarding Groundwater Bypass
As a measure to prevent contaminated water from accumulating, the groundwater bypass has begun its operation since May 2014, which pumps up groundwater on the mountain side before flowing into the buildings and drains the water into the ocean after checking its purity. The pumped up groundwater is once stored in temporary storage tanks, and then its radioactive material concentration is mesured to confirm that its quality meets the operation target.
The third-party organization also analyzes the radioactive material concentration to ensure the objectivity of the analysis result.
|
Cesium 134 |
Cesium 137 |
Gross β |
Strontium |
Tritium |
Operation Target |
1Bq/l |
1Bq/l |
5Bq/l |
- |
1500Bq/l |
Notification Level Limit (Reference) |
60Bq/l |
90Bq/l |
- |
30Bq/l |
60000Bq/l |
WHO Drinking Water Guideline |
10Bq/l |
10Bq/l |
- |
10Bq/l |
10000Bq/l |
Documents about summary, operational status, and related information of groundwater bypass are HERE.
Analysis Results of Pump Well
English form
Analysis Results of Temporary Storage Tanks
English form
Analysis Results of Weighted Average Sampling
English form
*The analysis of the water sampled before being discharged, which is mixed at the rate of each amount out of the whole amount of discharged water in a month.
Analysis Results Regarding Discharge
English form
Monitoring regarding Water Leakage Tanks
The sampling near the South Water Outlet, at the Drainage Channel, and around tanks in the H4 area has been continued in order to monitor the impact of several leakage accidents such as the leakage from the bottom flange of the No.5 tank in the H4 area I group happened in August, 2013, the dripping from the top plate of the B-A5 tank in the B south area happened in October, 2013, and the leakage from the top plate flange of the C1 tank in the H6 area happened in February, 2014.
South Water Outlet, Drainage Channel
English form
Observation Hole around H4 Area
English form
Observation Hole around H6 Area
English form
Analysis Results of Rainwater sprinkling Obtained Inside the Dike in the Tank Area After Treated by the Rainwater Treatment System
The rainwater accumulated inside the dike in the tank area has been sprinkled on the premises of Fukushima Daiichi NPS since May, 2014 after being purified by the desalination system (reverse osmosis membrane) etc.
English form
The newest data is on June 14, 2016.
Monitoring at the East Side of Unit 1-4 Turbine Buildings
Results of radioactive nuclide analysis for groundwater at the east side of Unit 1-4 Turbine Buildings and seawater at the port in order to monitor the source, the extent, and the effect of the radioactive materials in the groundwater toward the ocean.
English form
Detailed Analysis Results of Groundwater around Unit 1-4 Buildings
Radioactive materials were detected from the accumulated water inside the pits as a result of purification test at wells (subdrain pits), which is adjacent to Unit 1-4 Buildings at Fukushima Daiichi NPS. Since there is a possibility of being affected by fallout, we installed new observation well around Unit 1-4 Buildings in order to assess the impact of fallout.
The newest data is on October 1, 2014.
Analysis Results of Underground Reservoirs
open
The groundwater sampled from the leakage detection holes by the undergounrd reservoirs and the surrounding observation holes has been analyzed, and its impact on the surrounding environment has been monitored after the water leakage accident from the underground reservoirs happened in April, 2013.
The leak volume from the underground reservoirs was evaluated as approximatly 20~30 litters after the accident.
English form
September 29, 2017 |
Underground Reservoir Nuclide Analysis Results (As of September 28) |
September 28, 2017 |
Underground Reservoir Nuclide Analysis Results (As of September 27) |
September 27, 2017 |
Tritium Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of September 25) |
September 27, 2017 |
Underground Reservoir Observation Holes Nuclide Analysis Results (As of September 26) |
September 26, 2017 |
Nuclide Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of September 25) |
September 24,2017 |
Underground Reservoir Tritium Analysis Results (As of September 22) |
September 23, 2017 |
Underground Reservoir Nuclide Analysis Results (As of September 22) |
September 22, 2017 |
Underground Reservoir Nuclide Analysis Results (As of September 21) |
September 21, 2017 |
Tritium Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of September 19) |
September 21, 2017 |
Underground Reservoir Nuclide Analysis Results (As of September 20) |
September 20, 2017 |
Underground Reservoir Observation Holes Nuclide Analysis Results (As of September 19) |
September 20, 2017 |
Nuclide Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of September 19) |
September 17,2017 |
Underground Reservoir Tritium Analysis Results (As of September 15) |
September 16, 2017 |
Underground Reservoir Observation Holes Nuclide Analysis Results (As of September 15) |
September 16, 2017 |
Underground Reservoir Nuclide Analysis Results (As of September 15) |
September 15,2017 |
Underground Reservoir Observation Holes Nuclide Analysis Results (As of September 14) |
September 15, 2017 |
Underground Reservoir Observation Holes Nuclide Analysis Results (As of September 13) |
September 15, 2017 |
Underground Reservoir Nuclide Analysis Results (As of September 14) |
September 14,2017 |
Underground Reservoir Nuclide Analysis Results (As of September 13) |
September 13, 2017 |
Tritium Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of September 11) |
September 13, 2017 |
Underground Reservoir Observation Holes Nuclide Analysis Results (As of September 12) |
September 12, 2017 |
Nuclide Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of September 11) |
September 10,2017 |
Underground Reservoir Tritium Analysis Results (As of September 8) |
September 9,2017 |
Underground Reservoir Nuclide Analysis Results (As of September 8) |
September 9,2017 |
Underground Reservoir Tritium Analysis Results (As of September 7) |
September 8, 2017 |
Underground Reservoir Nuclide Analysis Results (As of September 7) |
September 8, 2017 |
Underground Reservoir Tritium Analysis Results (As of September 6) |
September 7, 2017 |
Underground Reservoir Nuclide Analysis Results (As of September 6) |
September 6, 2017 |
Tritium Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of September 4) |
September 6, 2017 |
Underground Reservoir Observation Holes Nuclide Analysis Results (As of September 5) |
September 5, 2017 |
Nuclide Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of September 4) |
September 2, 2017 |
Underground Reservoir Nuclide Analysis Results (As of September 1) |
Other
open
September 30, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 29, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 28, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power StationNuclide Analysis of the Radioactive Materials in the Fallouts obtained inside and outside of Fukushima Daiichi NPS Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 1 Reactor Building Nuclides Analysis Result of the Radioactive Materials in the Air at the Exhaust Facility of Unit 2 Reactor Building Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 3 Reactor Building Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 4 Reactor Building Gas Sampling Results of Unit 1 PCV Gas Control System Conducted at Fukushima Daiichi NPS Gas Sampling Results of Unit 2 PCV Gas Control System Conducted at Fukushima Daiichi NPS Gas Sampling Results of Unit 3 PCV Gas Control System Conducted at Fukushima Daiichi NPS Nuclides Analysis Result of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS (1) Nuclides Analysis Result of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS (2) |
September 27, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 26, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 25, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 24, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 23, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 22, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 21, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 20, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 19, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 18, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 17, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 16, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 15, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 14, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 13, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 12, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 11, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 10, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 9, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 8, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 7, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Stationin the ocean soil off the coast |
September 6, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power StationSeawater collected in offshore area of Ibaraki Prefecture |
September 5, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power StationSeawater collected in offshore area of Miyagi Prefecture |
September 4, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 3, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 2, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
September 1, 2017 |
Sampling Results of Drainage Water at Fukushima Daiichi Nuclear Power Station |
English form
The recent data is here.