Prompt Report of Analysis Results (November, 2015)
Air
Air on the premises of Power Station
English form
Result of radioactive nuclide analysis for the air sampled on the premises of the power station.
Seawater
Seawater near Power Station
English form
Result of radioactive nuclide analysis for the seawater sampled onshore and offshore of the power station.
Seawater near Intake Canals by Unit 1-4 side
English form
Result of radioactive nuclide analysis for the seawater sampled near the intake canals by the side of Unit 1-4 turbine buildings.
Leaked Water near South Discharge Cannel on Unit 1-4 side
English form
- *The sampling location has been changed on November 26, 2012. (Sampling is performed at approx. 1km south of the previous location.)
Result of radioactive nuclide analysis for the water sampled near the South Discharge Channel (approximately 330m south of the South Discharge Channel on Unit 1-4 side) in response to the leaked water from the pipeline connecting from Desalination System (Reverse Osmosis Membrane) to Concentrated Water Storage Tank (occurred on March 26 and April 5, 2012).
Seawater near Port Entrance
(Measurement by Radiation Monitor)
English form
The concentration level of radioactive materials included in sea water around the port entrance of the power station is measured continuously through a seawater radiation monitor.
Subdrain Water
Subdrain Water near the Turbine Buildings
English form
Sun |
Mon |
Tue |
Wed |
Thu |
Fri |
Sat |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
18 |
19 |
20 |
21 |
22 |
23 |
24 |
25 |
26 |
27 |
28 |
29 |
30 |
|
|
|
|
|
Result of radioactive nuclide analysis for the water sampled from the subdrain system near Unit 1-6 turbine buildings.
Subdrain Water around Centralized Radiation Waste Treatment Facility
English form
Result of radioactive nuclide analysis for the water sampled from the subdrain around the centralized waste treatment facility.
Sampling from Subdrain and Groundwater Drain
The subdrain and groundwater drain systems started operations from September 2015. The subdrain system (a measure to prevent the increase of contaminated water) pumps up groundwater from around the reactor buildings before it flows into them. The groundwater drain system (a measure to prevent the leakage of contaminated water) pumps up groundwater held back by the installed seaside impermeable wall before it flows into the port area. The water pumped by either system is purified, tested, and then discharged into the port area.
It is then stored in temporary storage tanks and the radioactive concentration is measured to confirm that the water quality does not surpass the upper limits set by TEPCO.
Third-party organizations also analyze the radioactive concentration to ensure the objectivity of the analysis results.
|
Cesium 134 |
Cesium 137 |
Gross β |
Strontium |
Tritium |
TEPCO's upper limit of radioactive concentration for temporary storage tanks |
1Bq/l |
1Bq/l |
3Bq/l |
- |
1500Bq/l |
Regulatory Notification Limit (for reference) |
60Bq/l |
90Bq/l |
- |
30Bq/l |
60000Bq/l |
WHO Guideline for Drinking Water |
10Bq/l |
10Bq/l |
- |
10Bq/l |
10000Bq/l |
Related materials about the activities and current operational status of Subdrain and Groundwater drain can be found HERE.
Analysis Results of Relay Tanks
Analysis Results of Temporary Storage Tanks and Water Collecting Tanks
English form
Analysis Results of Weighted Average Sampling
*The analysis of the water sampled before being discharged, which is mixed at the rate of each amount out of the whole amount of discharged water in a month.
Analysis Results Regarding Discharge
English form
Sampling regarding Groundwater Bypass
As a measure to prevent contaminated water from accumulating, the groundwater bypass has begun its operation since May 2014, which pumps up groundwater on the mountain side before flowing into the buildings and drains the water into the ocean after checking its purity. The pumped up groundwater is once stored in temporary storage tanks, and then its radioactive material concentration is mesured to confirm that its quality meets the operation target.
The third-party organization also analyzes the radioactive material concentration to ensure the objectivity of the analysis result.
|
Cesium 134 |
Cesium 137 |
Gross β |
Strontium |
Tritium |
Operation Target |
1Bq/l |
1Bq/l |
5Bq/l |
- |
1500Bq/l |
Notification Level Limit (Reference) |
60Bq/l |
90Bq/l |
- |
30Bq/l |
60000Bq/l |
WHO Drinking Water Guideline |
10Bq/l |
10Bq/l |
- |
10Bq/l |
10000Bq/l |
Documents about summary, operational status, and related information of groundwater bypass are HERE.
Analysis Results of Pump Well
English form
Analysis Results of Temporary Storage Tanks
English form
Analysis Results of Weighted Average Sampling
English form
*The analysis of the water sampled before being discharged, which is mixed at the rate of each amount out of the whole amount of discharged water in a month.
Analysis Results Regarding Discharge
English form
Monitoring regarding Water Leakage Tanks
The sampling near the South Water Outlet, at the Drainage Channel, and around tanks in the H4 area has been continued in order to monitor the impact of several leakage accidents such as the leakage from the bottom flange of the No.5 tank in the H4 area I group happened in August, 2013, the dripping from the top plate of the B-A5 tank in the B south area happened in October, 2013, and the leakage from the top plate flange of the C1 tank in the H6 area happened in February, 2014.
South Water Outlet, Drainage Channel
English form
Observation Hole around H4 Area
English form
Observation Hole around H6 Area
English form
Analysis Results of Rainwater sprinkling Obtained Inside the Dike in the Tank Area After Treated by the Rainwater Treatment System
The rainwater accumulated inside the dike in the tank area has been sprinkled on the premises of Fukushima Daiichi NPS since May, 2014 after being purified by the desalination system (reverse osmosis membrane) etc.
English form
The newest data is on September 30, 2015.
Monitoring at the East Side of Unit 1-4 Turbine Buildings
Results of radioactive nuclide analysis for groundwater at the east side of Unit 1-4 Turbine Buildings and seawater at the port in order to monitor the source, the extent, and the effect of the radioactive materials in the groundwater toward the ocean.
English form
Detailed Analysis Results of Groundwater around Unit 1-4 Buildings
Radioactive materials were detected from the accumulated water inside the pits as a result of purification test at wells (subdrain pits), which is adjacent to Unit 1-4 Buildings at Fukushima Daiichi NPS. Since there is a possibility of being affected by fallout, we installed new observation well around Unit 1-4 Buildings in order to assess the impact of fallout.
The newest data is on October 1, 2014.
Analysis Results of Underground Reservoirs
open
The groundwater sampled from the leakage detection holes by the undergounrd reservoirs and the surrounding observation holes has been analyzed, and its impact on the surrounding environment has been monitored after the water leakage accident from the underground reservoirs happened in April, 2013.
The leak volume from the underground reservoirs was evaluated as approximatly 20~30 litters after the accident.
English form
November 28, 2015 |
Underground Reservoir Nuclide Analysis Results (As of November 27) |
November 27, 2015 |
Underground Reservoir Tritium Analysis Results (As of November 20) |
November 27, 2015 |
Underground Reservoir Nuclide Analysis Results (As of November 26) |
November 26, 2015 |
Underground Reservoir Nuclide Analysis Results (As of November 25) |
November 25, 2015 |
Underground Reservoir Observation Holes Nuclide Analysis Results (As of November 24) |
November 24, 2015 |
Tritium Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of November 16) |
November 24, 2015 |
Nuclide Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of November 23) |
November 21, 2015 |
Underground Reservoir Nuclide Analysis Results (As of November 20) |
November 20, 2015 |
Underground Reservoir Tritium Analysis Results (As of November 13) |
November 20, 2015 |
Underground Reservoir Nuclide Analysis Results (As of November 19) |
November 19, 2015 |
Underground Reservoir Nuclide Analysis Results (As of November 18) |
November 18, 2015 |
Underground Reservoir Observation Holes Nuclide Analysis Results (As of November 17) |
November 17, 2015 |
Tritium Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of November 9) |
November 17, 2015 |
Nuclide Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of November 16) |
November 14, 2015 |
Underground Reservoir Nuclide Analysis Results (As of November 13) |
November 13, 2015 |
Underground Reservoir Tritium Analysis Results (As of November 5) |
November 13, 2015 |
Underground Reservoir Nuclide Analysis Results (As of November 12) |
November 12, 2015 |
Underground Reservoir Tritium Analysis Results (As of November 4) |
November 12, 2015 |
Underground Reservoir Nuclide Analysis Results (As of November 11) |
November 11, 2015 |
Underground Reservoir Observation Holes Nuclide Analysis Results (As of November 10) |
November 10, 2015 |
Tritium Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of November 2) |
November 10, 2015 |
Nuclide Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of November 9) |
November 7, 2015 |
Underground Reservoir Nuclide Analysis Results (As of November 6) |
November 6, 2015 |
Underground Reservoir Nuclide Analysis Results (As of November 5) |
November 5, 2015 |
Underground Reservoir Nuclide Analysis Results (As of November 4) |
November 4, 2015 |
Underground Reservoir Observation Holes Nuclide Analysis Results (As of November 3) |
November 3, 2015 |
Tritium Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of October 26) |
November 3, 2015 |
Nuclide Analysis Results of the Underground Bypass (Investigation Holes/Pumping Well) and the Sea Side Observation Holes (As of November 2) |
Other
open
November 30, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 29, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 28, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 27, 2015 |
Seawater collected in offshore area of Ibaraki PrefectureFukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 26, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet in the ocean soil off the coast (Dry Soil Rate : October 2015) |
November 25, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet Nuclide Analysis of the Radioactive Materials in the Fallouts obtained inside and outside of Fukushima Daiichi NPS Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 1 Reactor Building Nuclides Analysis Result of the Radioactive Materials in the Air at the Exhaust Facility of Unit 2 Reactor Building Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 3 Reactor Building Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 4 Reactor Building Gas Sampling Results of Unit 1 PCV Gas Control System Conducted at Fukushima Daiichi NPS Gas Sampling Results of Unit 2 PCV Gas Control System Conducted at Fukushima Daiichi NPS Gas Sampling Results of Unit 3 PCV Gas Control System Conducted at Fukushima Daiichi NPS Nuclides Analysis Result of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS (1) Nuclides Analysis Result of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS (2) |
November 24, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 23, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 22, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 21, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 20, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 19, 2015 |
Seawater collected in offshore area of Miyagi Prefecturein the soilFukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 18, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 17, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 16, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 15, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 14, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 13, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 12, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 11, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 10, 2015 |
in the soilFukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 9, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 8, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 7, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 6, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 5, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 4, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 3, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 2, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
November 1, 2015 |
Fukushima Daiichi Nuclear Power Station: Radiation Analysis Results at K Drainage Outlet |
English form
The recent data is here.