Result of Radioactive Analysis around Fukushima Daiichi Nuclear Power Station

Results of radioactive nuclide analysis are published for the sample for below items in the power station and its surrounding area.
* Only Japanese for holidays and weekends

Prompt Report of Result of Analysis (February, 2014)

in the Air at the Site of Power Station

Sun Mon Tue Wed Thu Fri Sat
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28

Result of radioactive nuclide analysis for the air sampled in the power station.

Seawater near Power Station

Sun Mon Tue Wed Thu Fri Sat
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28

Result of radioactive nuclide analysis for the seawater sampled on and offshore of the power station.

in Seawater taken near Intake Canal of Power Station

Sun Mon Tue Wed Thu Fri Sat
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28

Result of radioactive nuclide analysis for the seawater sampled at near the intake canal of unit 1 to 4 of the power station.

Subsurface Water near the Turbine Buildings

Sun Mon Tue Wed Thu Fri Sat
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28

Result of radioactive nuclide analysis for the water sampled from the sub drain around turbine buildings of unit 1 to 6.

Sub-drain Water in the Surroundings of Centralized Radiation Waste Treatment Facility

Sun Mon Tue Wed Thu Fri Sat
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28

Result of radioactive nuclide analysis for the water sampled from the sub drain around centralized waste treatment facility.

Monitoring at the East Side of Unit 1-4 Turbine Buildings

February 28, 2014
Detailed Analysis Results in the Port of Fukushima Daiichi NPS, around Discharge Channel and Bank Protection
February 27, 2014
Detailed Analysis Results in the Port of Fukushima Daiichi NPS, around Discharge Channel and Bank Protection
February 26, 2014
Detailed Analysis Results in the Port of Fukushima Daiichi NPS, around Discharge Channel and Bank Protection (2)

+ Display and non-display of article in the past

Results of radioactive nuclide analysis are published for the samples of groundwater at the east side of Unit 1-4 Turbine Buildings and seawater at the port in order to monitor the source and the extent of the radioactive materials in the groundwater, and whether the materials included in groundwater affect the sea.

Monitoring Regarding the Water Leak at Tank (South Water Outlet, Drainage Channel)

February 28, 2014
Sampling Results Regarding the Water Leak at the Tanks in the H4 area in Fukushima Daiichi Nuclear Power Station (South Water Outlet, Drainage Channel)
February 27, 2014
Sampling Results Regarding the Water Leak at the Tanks in the H4 area in Fukushima Daiichi Nuclear Power Station (South Water Outlet, Drainage Channel)
February 26, 2014
Sampling Results Regarding the Water Leak at the Tanks in the H4 area in Fukushima Daiichi Nuclear Power Station (South Water Outlet, Drainage Channel)

+ Display and non-display of article in the past

Monitoring Regarding the Water Leak at Tank (Observation Hole around the H4 Area)

February 28, 2014
Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area) (3)
February 28, 2014
Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area) (2)
February 28, 2014
Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Around the H4 Area)

+ Display and non-display of article in the past

Investigation of Impact on the Groundwater Bypass Regarding the Water Leak at Tank (Pump Well)

February 27, 2014
Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Pump Well)
February 20, 2014
Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Pump Well)
February 14, 2014
Sampling Results Regarding the Influence on the Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Pump Well)

+ Display and non-display of article in the past

Detailed Analysis Results of Groundwater Obtained around Unit 1 to 4

February 25, 2014
Detailed Analysis Results of Groundwater Obtained around Unit 1-4 Building at Fukushima Daiichi Nuclear Power Station

Radioactive material was detected from the accumulated water inside the pit as a result of purification test at a well (sub-drain pit), which is adjacent to Unit 1-4 Buildings at Fukushima Daiichi Nuclear Power Station. Since there is a possibility that the water was affected by fallout, we installed new observation well around Unit 1-4 Buildings in order to assess the impact of fallout.

Nuclide Analysis Results of the Underground Reservoirs

February 28, 2014
Nuclide Analysis Results of the Underground Reservoirs/Underground Reservoirs Observation Holes (As of February 27)
February 27, 2014
Nuclide Analysis Results of the Underground Reservoirs/Underground Reservoirs Observation Holes (As of February 19)
February 27, 2014
Underground Reservoir Tritium Analysis Results (As of February 26)

+ Display and non-display of article in the past

Other

February 28, 2014
Seawater collected in offshore area of Ibaraki Prefecture
February 27, 2014
in the ocean soil off the coast (Dry Soil Rate : January 2014)
February 26, 2014
Nuclide Analysis of the Radioactive Materials in the Fallouts obtained inside and outside of Fukushima Daiichi Nuclear Power Station
Nuclides Analysis Result of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS
Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 1 Reactor Building
Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 4 Reactor Building
Gas Sampling Results of Unit 1 PCV Gas Control System Conducted at Fukushima Daiichi Nuclear Power Station
February 25, 2014
Nuclide Analysis Results of Radioactive Materials in Accumulated Water in Turbine Building Basement at Fukushima Daiichi NPS
February 20, 2014
Seawater collected in offshore area of Miyagi Prefecture
February 19, 2014
Nuclides Analysis Result of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS
Nuclides Analysis Results of the Radioactive Materials in the Air at the Opening of Buildings at Fukushima Daiichi NPS
Nuclides Analysis Result of the Radioactive Materials in the Air at the Exhaust System of the Unit 2 Reactor Building
Nuclides Analysis Result of the Radioactive Materials in the Air at the Upper Part of Unit 3 Reactor Building
Gas Sampling Results of Unit 2 PCV Gas Control System Conducted at Fukushima Daiichi Nuclear Power Station
Gas Sampling Results of Unit 3 PCV Gas Control System Conducted at Fukushima Daiichi Nuclear Power Station
February 7, 2014
Seawater collected in offshore area of Ibaraki Prefecture
February 6, 2014
Seawater collected in offshore area of Miyagi Prefecture

Confirmed Results of Analysis

Analysis results of the major 3 nuclides (I-131, Cs-134, Cs-137) are being announced as flash report on a daily basis.
With regard to reevaluation of the major 3 nuclides and analysis results of γ nuclides except for the major 3 nuclides are being announced as definite report.

February 26, 2014
For updated from January 16 to January 31
February 18, 2014
For updated from January 1 to January 15

Seawater taken from Unit 1 to 4 side of South Discharge Channel (February, 2014)

Sun Mon Tue Wed Thu Fri Sat
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28

Nuclide analysis is in operation on the radioactive materials in the water sampled near the South Discharge Channel (approximately 330m south of Unit 1-4 side of the South Discharge Channel) in response to the leaked water from the pipeline connecting from Desalination System (Reverse Osmosis Membrane) to Concentrated Water Storage Tank (occurred on March 26 and April 5, 2012).

* The sampling location has been changed on November 26, 2012. (Sampling is performed at approx. 1km south of the previous location.)

Analysis Results of Water at Water Treatment Facility

February 14, 2014
Measurement results of radioactive density of water at water treatment facility

Analysis Results of Fish and Shellfish(The Ocean Area Within 20km Radius of Fukushima Daiichi NPS)

February 19, 2014
Nuclide Analysis Results of Fish and Shellfish (In the port of Fukushima Daiichi NPS)
Nuclide Analysis Results of Fish and Shellfish (The Ocean Area Within 20km Radius of Fukushima Daiichi NPS) (Exclude in the port of Fukushima Daiichi NPS)