search


Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > Water Leak from the Alternative Cooling System Secondary System for Unit 3 Spent Fuel Pool in Fukushima Daiichi NPS (1st issue and the following information)

Fukushima Daiichi NPS Prompt Report 2013

Fukushima Daiichi NPS Prompt Report (Dec 11, 2013)Water Leak from the Alternative Cooling System Secondary System for Unit 3 Spent Fuel Pool in Fukushima Daiichi NPS (1st issue and the following information)

At around 10:20 AM today (on December 11), a TEPCO employee on a patrol found the filtered water was dropping from a joint part of metal flexible hose of the alternative cooling system secondary system (System A) for the spent fuel pool at Unit 3, at the pace of approximately a drop per 5 seconds.

The leak was found seeped on the ground over a range of approx. 50cm×40cm.

The leaking point is the joint part between the heat exchanger (System A) inlet valve and the heat exchanger.

At 11:05 AM today (on December 11), we isolated the heat exchanger (System A), and at 11:17 AM, the dropping stopped.

The spent fuel pool is continuously cooled down with the System B.

We are currently examining the site and investigating causes etc. for this leak.


to TOP