Fukushima Daiichi NPS Prompt Report (Nov 21, 2013)Hot test resumption for System B of Multi-Nuclide Removal Equipment (ALPS) in Fukushima Daiichi NPS

At 10:00 AM today (on November 21), we resumed a hot test for the System B of the multi-nuclide removal equipment after we completed the corrosion preventions and preparation concerning the System B of the multi-nuclide removal equipment (ALPS). After resuming the hot test, we went on a patrol, and confirmed no abnormality such as leakage etc.

Around in the end December, the treatment operation will be temporality stopped for the purpose of validating the effectiveness of the corrosion prevention.

We will operate two out of three systems in order to enhance the operational rate of the two-system operation, and will start the three-system operation as soon as ready.