search


Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > Overflow of Water from the Dike of H8-South Area at Fukushima Daiichi NPS

Fukushima Daiichi NPS Prompt Report 2013

Fukushima Daiichi NPS Prompt Report (Oct 02, 2013)Overflow of Water from the Dike of H8-South Area at Fukushima Daiichi NPS

At 12:20 PM today (on October 2), a TEPCO employee found that water level inside the dike of H8-south area (where welding tanks storing RO concentrated saltwater are being installed) had risen due to the effects of the typhoon, and the accumulated water (rainwater) had crossed the dike.

Therefore, at 1:09 PM on the same day, we started transferring the accumulated water inside the dike to the tank H8.

The leakage amount of the accumulated water (rainwater) from this dike is currently evaluated in detail.


to TOP