Fukushima Daiichi NPS Prompt Report (Sep 29, 2013)Water Bleeding from the Tank J2 at F Area Tank (on the North of Unit 6) (Follow-up Information)

This is follow-up information on water bleeding from the tank J2 at F area tank (on the north of Unit 6).

After finding the water bleeding, we have additionally confirmed the following aspects:
- Although we found water bleeding at the horizontal flange connection part between the first and second layers, no water dropping was found on the floor.
- We have analyzed the bleeding water for contamination with smear method, and found that the water is equivalent to the background level.

By way of caution, we have installed a temporal tray at the bleeding part.

No change was found on patrol this morning (on September 29).