This is a follow-up report on the statuses of steam found wafting through the air near the central part of the fifth floor (equipment storage pool side) of Unit 3 on July 18.
Although the steam has not found since around 9:40 AM on September 17, at around 8:00 AM today (on September 18), we found steam coming again from near the central part of the fifth floor (equipment storage pool side) of Unit 3 by a camera.
No abnormality has been found on the plant status and the monitoring post readings at present (as of 8:10 AM).
- Reactor water injection, cooling of the spent fuel pool:
Continuing stably
- Monitoring post readings, continuous dust monitor amounts:
No significant change was found
- Temperature of RPV/PCV:
No significant change was found
- Pressure of dry well:
No significant change was found
- Noble gas monitor:
No significant change was found
- Nitrogen injection
Continuing stably
- Weather condition:
Air temperature 21.7℃, humidity 82.9%
* The weather condition is as of 8:00 AM on September 18.
We will continue to monitor the status closely.