Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > Tritium Density Result of Water Quality Survey inside the Port of Fukushima Daiichi NPS (Follow-up Information 42)
At 1:16 PM today (on August 24), water transfer from the Unit 2 branch trench (the vertical shaft B and the power cable trench) to Unit 2 Turbine Building, which was started at 2:55 PM on August 22, was stopped. All of the transfer was completed.
© Tokyo Electric Power Company Holdings, Inc.