search


Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > Alarm Went off at the Second Cesium Adsorption Apparatus (SARRY) at Fukushima Daiichi Nuclear Power Station

Fukushima Daiichi NPS Prompt Report 2013

Fukushima Daiichi NPS Prompt Report (Aug 10, 2013)Alarm Went off at the Second Cesium Adsorption Apparatus (SARRY) at Fukushima Daiichi Nuclear Power Station

At around 2:22 PM today (on August 10), an alarm went off indicating the suspension of a booster pump and the detection of leakage, when the second cesium adsorption apparatus (SARRY) was in operation.

The booster pump has been under operation currently.

We are now checking the site status.

to TOP