Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station (Follow-up Information 15)
This is a follow-up report on the statuses of steam found wafting through the air near the central part of the fifth floor (equipment storage pool side) of Unit 3 on July 18.
As of the steam coming from near the central part of the fifth floor (equipment storage pool side) of Unit 3 at around 4:15 AM on July 24, it had been observed intermittently. However, it has not found since 8:00 AM today (August 4).
The plant status and the monitoring post readings at present (at 8:00 AM) are as follows, and no abnormality has been found.
- Reactor water injection, cooling of the spent fuel pool:
Continuing stably
- Monitoring post readings, continuous dust monitor amounts:
No significant change was found
- Temperature of RPV/PCV:
No significant change was found
- Pressure of dry well:
No significant change was found
- Noble gas monitor:
No significant change was found
- Nitrogen injection:
No significant change was found
- Weather condition (as of 8:10 AM):
Air temperature 24.2℃, humidity 66.9%
We will continue to monitor the status closely.
© Tokyo Electric Power Company Holdings, Inc.