search


Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > Suspension of the Second Cesium Adsorption Apparatus (SARRY) at Fukushima Daiichi Nuclear Power Station

Fukushima Daiichi NPS Prompt Report 2013

Fukushima Daiichi NPS Prompt Report (Jul 30, 2013)Suspension of the Second Cesium Adsorption Apparatus (SARRY) at Fukushima Daiichi Nuclear Power Station

At around 9:53 AM today (July 30), an alarm went off indicating the suspension of a booster pump and the detection of leakage, and the second cesium adsorption apparatus (SARRY) was suspended.

No leakage was found as a result of site investigation by a TEPCO employee.

Water treatment and reactor water injection were not affected due to the incident.

We will investigate the details.


to TOP