Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > Water leakage found at the desalination system (reverse osmosis membrane) in Fukushima Daiichi Nuclear Power Station (Follow-up Information No.2)

Fukushima Daiichi NPS Prompt Report 2013

Fukushima Daiichi NPS Prompt Report (Jun 21, 2013)Water leakage found at the desalination system (reverse osmosis membrane) in Fukushima Daiichi Nuclear Power Station (Follow-up Information No.2)

This is a follow-up report on the investigation statuses of the water leakage found at the desalination system 3 (reverse osmosis membrane RO-3).

The nuclide analysis results of leaked water are as follows.

Cs-134: 5.7×10-1 [Bq/cm3]
Cs-137: 1.7×100 [Bq/cm3]
Co-60: 1.4×10-1 [Bq/cm3]
Sb-125: 1.5×101 [Bq/cm3]
All β: 2.6×104 [Bq/cm3]

According to the above results, we judged that the leaked water was the water before treatment at the entrance of the desalination system 3 (reverse osmosis membrane RO-3).

We will continue to identify the cause of the leakage.