Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > A water droplet found at the batch treatment tank 2A of multi-nuclide removal equipment in Fukushima Daiichi Nuclear Power Station (Follow-up Information No.2)
This is a follow-up report on the statuses of a water droplet found at the batch treatment tank 2A of multi-nuclide removal equipment.
The nuclide analysis results of the dew condensation water (370ml) which was received at a bucket placed under the tank for approx. 16 hours from yesterday (June 16) are as follows.
[Nuclide analysis results of water received at the bucket]
- Cs-134: 1.9×100 [Bq/cm3]
- Cs-137: 3.9×100 [Bq/cm3]
- All β: 6.7×103 [Bq/cm3]
Stop operation of multi-nuclide removal equipment A system has started at 6:17 PM yesterday (June 16) and the equipment has suspended at 11:20 PM on June 16.