This is follow-up information regarding the water leak from the underground reservoirs at Fukushima Daiichi NPS.
Today (April 26), chloride concentration analysis was performed in the drain holes of the underground reservoirs No.1-7 (at 14 locations) and the leakage detection holes (samples could not be collected at 3 out of 10 locations) of the underground reservoirs No.1-4 and 6. The results are as follows.
No significant change was found with the results compared to the previous day (April 25).
The water level, etc. of the underground reservoirs will continue to be intensively monitored.
[Chloride concentration analysis results on April 26]
- Drain hole (northeast) of the underground reservoir No.1
Sampling performed at 5:00 AM on April 26
Chloride concentration: 17ppm
- Drain hole (southwest) of the underground reservoir No.1
Sampling performed at 5:00 AM on April 26
Chloride concentration: 6ppm
- Drain hole (northeast) of the underground reservoir No.2
Sampling performed at 5:10 AM on April 26
Chloride concentration: 8ppm
- Drain hole (southwest) of the underground reservoir No.2
Sampling performed at 5:10 AM on April 26
Chloride concentration: 7ppm
- Drain hole (northeast) of the underground reservoir No.3
Sampling performed at 5:20 AM on April 26
Chloride concentration: 7ppm
- Drain hole (southwest) of the underground reservoir No.3
Sampling performed at 5:20 AM on April 26
Chloride concentration: 4ppm
- Drain hole (northeast) of the underground reservoir No.4
Sampling performed at 5:30 AM on April 26
Chloride concentration: 10ppm
- Drain hole (southwest) of the underground reservoir No.4
Sampling performed at 5:30 AM on April 26
Chloride concentration: 8ppm
- Drain hole (northeast) of the underground reservoir No.5
Sampling performed at 5:40 AM on April 26
Chloride concentration: 9ppm
- Drain hole (southwest) of the underground reservoir No.5
Sampling performed at 5:40 AM on April 26
Chloride concentration: 8ppm
- Drain hole (northeast) of the underground reservoir No.6
Sampling performed at 5:50 AM on April 26
Chloride concentration: 10ppm
- Drain hole (southwest) of the underground reservoir No.6
Sampling performed at 5:50 AM on April 26
Chloride concentration: 8ppm
- Drain hole (northeast) of the underground reservoir No.7
Sampling performed at 6:00 AM on April 26
Chloride concentration: 6ppm
- Drain hole (southwest) of the underground reservoir No.7
Sampling performed at 6:00 AM on April 26
Chloride concentration: 8ppm
- Leakage detection hole (northeast) of the underground reservoir No.1
Sampling performed at 8:20 AM on April 26
Chloride concentration: 1200ppm
- Leakage detection hole (southwest) of the underground reservoir No.1
Sampling performed at 8:25 AM on April 26
Chloride concentration: 7ppm
- Leakage detection hole (northeast) of the underground reservoir No.2
Sampling performed at 8:35 AM on April 26
Chloride concentration: 12ppm
- Leakage detection hole (southwest) of the underground reservoir No.2
Sampling performed at 8:40 AM on April 26
Chloride concentration: 11ppm
- Leakage detection hole (northeast) of the underground reservoir No.3
*Sampling was not performed since the amount of sample necessary for analysis could not be obtained.
- Leakage detection hole (southwest) of the underground reservoir No.3
Sampling performed at 8:50 AM on April 26
Chloride concentration: 15ppm
- Leakage detection hole (northeast) of the underground reservoir No.4
Sampling performed at 9:10 AM on April 26
Chloride concentration: 10ppm
- Leakage detection hole (southwest) of the underground reservoir No.4
*Sampling was not performed since the amount of sample necessary for analysis could not be obtained.
- Leakage detection hole (northeast) of the underground reservoir No.6
Sampling performed at 9:25 AM on April 26
Chloride concentration: 8ppm
- Leakage detection hole (southwest) of the underground reservoir No.6
*Sampling was not performed since the amount of sample necessary for analysis could not be obtained.
The following information was announced at 3:09 PM on April 25, 2013
[Chloride concentration analysis results on April 25]
- Drain hole (northeast) of the underground reservoir No.1
Sampling performed at 5:00 AM on April 25
Chloride concentration: 18ppm
- Drain hole (southwest) of the underground reservoir No.1
Sampling performed at 5:05 AM on April 25
Chloride concentration: 6ppm
- Drain hole (northeast) of the underground reservoir No.2
Sampling performed at 5:15 AM on April 25
Chloride concentration: 9ppm
- Drain hole (southwest) of the underground reservoir No.2
Sampling performed at 5:10 AM on April 25
Chloride concentration: 7ppm
- Drain hole (northeast) of the underground reservoir No.3
Sampling performed at 5:20 AM on April 25
Chloride concentration: 7ppm
- Drain hole (southwest) of the underground reservoir No.3
Sampling performed at 5:25 AM on April 25
Chloride concentration: 4ppm
- Drain hole (northeast) of the underground reservoir No.4
Sampling performed at 5:30 AM on April 25
Chloride concentration: 9ppm
- Drain hole (southwest) of the underground reservoir No.4
Sampling performed at 5:35 AM on April 25
Chloride concentration: 8ppm
- Drain hole (northeast) of the underground reservoir No.5
Sampling performed at 5:40 AM on April 25
Chloride concentration: 9ppm
- Drain hole (southwest) of the underground reservoir No.5
Sampling performed at 5:45 AM on April 25
Chloride concentration: 7ppm
- Drain hole (northeast) of the underground reservoir No.6
Sampling performed at 5:50 AM on April 25
Chloride concentration: 11ppm
- Drain hole (southwest) of the underground reservoir No.6
Sampling performed at 5:55 AM on April 25
Chloride concentration: 8ppm
- Drain hole (northeast) of the underground reservoir No.7
Sampling performed at 6:00 AM on April 25
Chloride concentration: 6ppm
- Drain hole (southwest) of the underground reservoir No.7
Sampling performed at 6:05 AM on April 25
Chloride concentration: 7ppm
- Leakage detection hole (northeast) of the underground reservoir No.1
Sampling performed at 8:10 AM on April 25
Chloride concentration: 1200ppm
- Leakage detection hole (southwest) of the underground reservoir No.1
Sampling performed at 8:15 AM on April 25
Chloride concentration: 7ppm
- Leakage detection hole (northeast) of the underground reservoir No.2
Sampling performed at 8:25 AM on April 25
Chloride concentration: 12ppm
- Leakage detection hole (southwest) of the underground reservoir No.2
Sampling performed at 8:25 AM on April 25
Chloride concentration: 11ppm
- Leakage detection hole (northeast) of the underground reservoir No.3
*Sampling was not performed since the amount of sample necessary for analysis could not be obtained.
- Leakage detection hole (southwest) of the underground reservoir No.3
Sampling performed at 8:35 AM on April 25
Chloride concentration: 15ppm
- Leakage detection hole (northeast) of the underground reservoir No.4
Sampling performed at 9:00 AM on April 25
Chloride concentration: 9ppm
- Leakage detection hole (southwest) of the underground reservoir No.4
*Sampling was not performed since the amount of sample necessary for analysis could not be obtained.
- Leakage detection hole (northeast) of the underground reservoir No.6
Sampling performed at 9:20 AM on April 25
Chloride concentration: 7ppm
- Leakage detection hole (southwest) of the underground reservoir No.6
*Sampling was not performed since the amount of sample necessary for analysis could not be obtained.