search


Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > Water Leak from the Underground Reservoirs in Fukushima Daiichi Nuclear Power Station (Follow-up Information No.91)

Fukushima Daiichi NPS Prompt Report 2013

Fukushima Daiichi NPS Prompt Report (Apr 24, 2013)Water Leak from the Underground Reservoirs in Fukushima Daiichi Nuclear Power Station (Follow-up Information No.91)

This is follow-up information regarding the water leak from the underground reservoirs at Fukushima Daiichi NPS.

Today (April 24), chloride concentration analysis was performed in the drain holes of the underground reservoirs No.1-7 (at 14 locations) and the leakage detection holes (samples could not be collected at 3 out of 10 locations) of the underground reservoirs No.1-4 and 6. The results are as follows.

No significant change was found with the results compared to the previous day (April 23).

The water level, etc. of the underground reservoirs will continue to be intensively monitored.

[Chloride concentration analysis results on April 24]

- Drain hole (northeast) of the underground reservoir No.1
Sampling performed at 5:20 AM on April 24
Chloride concentration: 15ppm

- Drain hole (southwest) of the underground reservoir No.1
Sampling performed at 5:20 AM on April 24
Chloride concentration: 5ppm

- Drain hole (northeast) of the underground reservoir No.2
Sampling performed at 5:30 AM on April 24
Chloride concentration: 9ppm

- Drain hole (southwest) of the underground reservoir No.2
Sampling performed at 5:30 AM on April 24
Chloride concentration: 6ppm

- Drain hole (northeast) of the underground reservoir No.3
Sampling performed at 5:50 AM on April 24
Chloride concentration: 6ppm

- Drain hole (southwest) of the underground reservoir No.3
Sampling performed at 5:50 AM on April 24
Chloride concentration: 4ppm

- Drain hole (northeast) of the underground reservoir No.4
Sampling performed at 6:00 AM on April 24
Chloride concentration: 9ppm

- Drain hole (southwest) of the underground reservoir No.4
Sampling performed at 6:00 AM on April 24
Chloride concentration: 8ppm

- Drain hole (northeast) of the underground reservoir No.5
Sampling performed at 6:10 AM on April 24
Chloride concentration: 8ppm

- Drain hole (southwest) of the underground reservoir No.5
Sampling performed at 6:10 AM on April 24
Chloride concentration: 7ppm

- Drain hole (northeast) of the underground reservoir No.6
Sampling performed at 6:20 AM on April 24
Chloride concentration: 10ppm

- Drain hole (southwest) of the underground reservoir No.6
Sampling performed at 6:20 AM on April 24
Chloride concentration: 7ppm

- Drain hole (northeast) of the underground reservoir No.7
Sampling performed at 6:30 AM on April 24
Chloride concentration: 5ppm

- Drain hole (southwest) of the underground reservoir No.7
Sampling performed at 6:30 AM on April 24
Chloride concentration: 7ppm

- Leakage detection hole (northeast) of the underground reservoir No.1
Sampling performed at 8:00 AM on April 24
Chloride concentration: 1200ppm

- Leakage detection hole (southwest) of the underground reservoir No.1
Sampling performed at 8:05 AM on April 24
Chloride concentration: 7ppm

- Leakage detection hole (northeast) of the underground reservoir No.2
Sampling performed at 8:10 AM on April 24
Chloride concentration: 12ppm

- Leakage detection hole (southwest) of the underground reservoir No.2
Sampling performed at 8:15 AM on April 24
Chloride concentration: 10ppm

- Leakage detection hole (northeast) of the underground reservoir No.3
*Sampling was not performed since the amount of sample necessary for analysis could not be obtained.

- Leakage detection hole (southwest) of the underground reservoir No.3
Sampling performed at 8:25 AM on April 24
Chloride concentration: 17ppm

- Leakage detection hole (northeast) of the underground reservoir No.4
Sampling performed at 9:00 AM on April 24
Chloride concentration: 9ppm

- Leakage detection hole (southwest) of the underground reservoir No.4
*Sampling was not performed since the amount of sample necessary for analysis could not be obtained.

- Leakage detection hole (northeast) of the underground reservoir No.6
Sampling performed at 9:30 AM on April 24
Chloride concentration: 8ppm

- Leakage detection hole (southwest) of the underground reservoir No.6
*Sampling was not performed since the amount of sample necessary for analysis could not be obtained.


to TOP