Fukushima Daiichi NPS Prompt Report (Apr 12, 2013)Water Leak from the Underground Reservoirs in Fukushima Daiichi Nuclear Power Station (Follow-up Information No.46)

This is follow-up information regarding the water leak from the underground reservoirs at Fukushima Daiichi NPS.

Regarding the leakage which occurred during the water transfer from the underground reservoir No.3 to No.6, the connection part (flange) of the pipe was repaired. The water transfer has been started at 9:56 PM today.

At 11:00 PM, it was confirmed that no leakage was found on the transfer line including the location of the previous leakage (flange).