Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > Water Leak from the Underground Reservoir No.2 in Fukushima Daiichi Nuclear Power Station (Follow-up Information No.6)
This is follow-up information and data correction regarding the water leak from the underground reservoir No. 2 in Fukushima Daiichi NPS.
To add one more temporary pump (approx. 30 m3/h), we temporarily stopped the three temporary pumps at 12:07 pm. At 12:52 pm, we started operating the additional temporary pump after we had confirmed the condition of the temporary transferring line.
At 12:55 pm, we conducted an on-site survey and confirmed that there is no abnormality such as leakage on the transferring line.
At 12:57 pm, we started operating the three temporary pump, and we conducted an on-site survey at 12:58 pm and confirmed that there was no abnormality such as leakage on the transferring line.
We would like to correct the flow rates of the tree temporary pumps here.
(Wrong) The flow rates of the tree temporary pumps: Approx. 20.8 m3/h
(Correct) The flow rates of the tree temporary pumps: Approx. 30.3 m3/h, 60 m3/h, and 48 m3/h
We are analyzing the number of days necessary to transfer the water.