Press Release (Jan 30, 2013)Results of FY 2012 3rd Quarter Safety Inspection and Safety Investigation of our Nuclear Power Stations Performed by the Nuclear Regulatory Agency

As a result of FY 2012 3rd quarter safety inspection and the safety investigation (performed outside of the safety inspection period) by the Nuclear Regulatory Agency, a total of 7 technical specification non-conformances (5 at Fukushima Daiichi Nuclear Power Station and 2 at Kashiwazaki-Kariwa Nuclear Power Station) have been judged to be "monitoring required" items by the Nuclear Regulation Authority.

In accordance with the safety inspection/investigation results, we will make efforts towards improved operation quality.

(Appendixes)
Appendix 1: Outline of technical specification non-conformances judged to be "monitoring required" as a result of FY 2012 3rd quarter safety inspection and safety investigation (Fukushima Daiichi Nuclear Power Station)(PDF 22.0KB)
Appendix 2: Outline of technical specification non-conformances judged to be "monitoring required" as a result of FY 2012 3rd quarter safety inspection and safety investigation (Kashiwazaki-Kariwa Nuclear Power Station)(PDF 128KB)