search



Corporate Information

 
Press Release (Feb 14,2012)
Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 14)
 Due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake which occurred on March 
11, 2011, TEPCO's facilities including our nuclear power stations have 
been severely damaged. We deeply apologize for the anxiety and 
inconvenience caused. 
With regard to the accident at Fukushima Daiichi Nuclear Power Station, on 
April 17, 2011, we have compiled the roadmap towards restoration from the 
accident and on July 19 we accomplished the Step1 target "Radiation dose 
is in steady decline". Then on December 16 we confirmed the accomplishment 
of the Step 2 target "Release of radioactive materials is under control 
and radiation doses are being significantly held down". 
In addition, on December 21, 2011, we have compiled the "Mid-to-long-Term 
Roadmap toward the Decommissioning of Fukushima Daiichi Nuclear Power 
Units 1-4, TEPCO". 
In addition to the maintenance of the plant's stable condition, we will 
implement Mid-to-Long Term countermeasures towards the decommissioning of 
Fukushima Daiichi Nuclear Power Units 1-4 to enable evacuees to return to 
their homes as soon as possible and reduce the anxiety of the people in 
Fukushima and the whole nation as soon as possible. 
 
Below is the status of TEPCO's major facilities. 
 
* Updates are underlined. 
 
 [Nuclear Power Station] 
 
・ Fukushima Daiichi Nuclear Power Station: Unit 1 to 3: shut down due 
  to the earthquake: 
  (Units 4 to 6: outage due to regular inspections before the earthquake) 
 
- In order to conduct inspection of the strainer changeover valve of the 
  pump of the reactor sea water system of Unit 6 from February 14 to 
  February 17, at 10:02 am on February 14, we stopped cooling of the spent 
  fuel pool by the spent fuel pool cooling system (B) and at 10:06 am on 
  the same day, we stopped the pump of the reactor sea water system (A) 
  (spent fuel pool water temperature during the stoppage: approx. 23°C). 
  Because the spent fuel pool cooling system isn't in operation during the 
  inspection, we conduct alternating cooling of the reactor and the spent 
  fuel pool by the residual heat removal system. The water temperature in 
  the reactor and the spent fuel pool are expected to rise up to 37°C and 
  31°C respectively during the inspection, but in terms of the temperature 
  raise, we estimate that it is not a problem. 
 
・ Fukushima Daini Nuclear Power Station: 
  (Units 1 to 4: shutdown due to the earthquake) 
 
- At 10:08 am on February 14, we opened the airlock for staff (hatch to 
  come in and out of the primary containment vessel) and started visual 
  inspection to confirm soundness of the primary containment vessel of 
  Unit 3 and the inside facilities. 
 
・ Kashiwazaki Kariwa Nuclear Power Station: Units 6: under normal operation 
  (Units 1 to 5 and 7: outage due to regular inspections) 
 
 [Thermal Power Station] 
・ Power supply has returned to normal and the facilities damaged by the 
  earthquake are now being handled in a timely manner. 
 
 [Hydro Power Station] 
・ Power supply has returned to normal and the facilities damaged by the 
  earthquake are now being handled in a timely manner. 
 
 [Impacts on Transmission Facilities] 
・ Power supply has returned to normal and the facilities damaged by the 
  earthquake are now being handled in a timely manner. 
 
 [Impacts on Power Supply and Demand Balance] 
This winter, there are some minus factors such as the regular inspection 
of Unit 5 at Kashiwazaki-Kariwa Nuclear Power Station. On the other hand, 
there are several plus factors such as the recovery of the common thermal 
power stations which suffered the earthquake. As a result, we expect to 
secure 53.7 GW (at the end of February) supply power. 
Compared to the maximum demand in the last winter, which is 51.5 GW, we 
will have 2.2 GW generation reserve margin. 
 
We expect to maintain stable power supply this winter, however, as there 
remains possibilities of unplanned shutdowns at our power stations and 
growth in the demand according to the rapid change in the temperature, we 
would like to ask your reasonable effort to save electricity.
 
We will continue to make our efforts to maintain stable operation and 
maintenance of the power facilities in order to "prevent in principle" the 
planned blackouts and secure power supply. 
 
 
Appendix: Past Progress (As of 3:00 pm on February 14, 2012) (PDF 429KB) 
Appendix: Past Progress (From March 11, 2011 to July 31, 2011) (PDF 225KB) 
 
* Revised past progress 
  
back to page top


to TOP