Press Release (Feb 12,2012)
Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 12)
Due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake which occurred on March 
11, 2011, TEPCO's facilities including our nuclear power stations have been 
severely damaged. We deeply apologize for the anxiety and inconvenience 
caused.
With regard to the accident at Fukushima Daiichi Nuclear Power Station, on 
April 17, 2011, we have compiled the roadmap towards restoration from the 
accident and on July 19 we accomplished the Step1 target "Radiation dose 
is in steady decline". Then on December 16 we confirmed the accomplishment 
of the Step 2 target "Release of radioactive materials is under control 
and radiation doses are being significantly held down".
In addition, on December 21, 2011, we have compiled the "Mid-to-long-Term 
Roadmap toward the Decommissioning of Fukushima Daiichi Nuclear Power Units 
1-4, TEPCO".
In addition to the maintenance of the plant's stable condition, we will 
implement Mid-to-Long Term countermeasures towards the decommissioning of 
Fukushima Daiichi Nuclear Power Units 1-4 to enable evacuees to return to 
their homes as soon as possible and reduce the anxiety of the people in 
Fukushima and the whole nation as soon as possible.

Below is the status of TEPCO's major facilities.

* Updates are underlined. 
[Nuclear Power Station] 

· Fukushima Daiichi Nuclear Power Station: Unit 1 to 3: shut down due to 
  the earthquake:
    (Units 4 to 6: outage due to regular inspections before the earthquake)
 
  - From February 2, tendency of temperature rise at the bottom of PCV has 
    been observed. While we increased the water injection to the reactor 
    and have been monitoring the trend of the temperature, it is still high 
    around 70°C. On February 6, we sampled the gas by the gas control 
    system of Unit 2 Primary Containment Vessel. The density of Xenon 135 
    at the entrance of the system was below the detection limit. Since it 
    is below 1Bq/cm3, which is the threshold for judging re-criticality, 
    we confirmed the reactor didn't go re-critical, however, in order to 
    avoid the possibility of going re-critical being increased as a result 
    of the water density in the reactor being increased by rapid injection 
    of cold water is increased, we injected the boric acid into the reactor 
    as a safety countermeasure from 0:19 am to 3:20 am on February 7, which 
    was before we increased the volume of the water injection. At 4:24 am 
    on the same day, we changed the amount of the core spray system 
    injection water from 3.7m3/h to 6.7m3/h (the amount of the continuing 
    feed water system injection is 6.8m3/h). After that, we continued to 
    monitor the temperature tendency, finding that the temperature slowly 
    increased. At 10:45 pm on February 11, we changed the water injection 
    amount through the reactor feed water system from approx. 6.8m3/h to 
    7.8m3/h (the water injection amount through the core spray system is 
    kept at approx. 6.8m3/h). On February 12, we conducted a sampling of 
    gas in the gas management system in the Primary Containment Vessel of 
    Unit 2 and the result is that around the entry of the system, Xe-135 
    was below the detection limit (9.5 x 10-2 Bq/cm3). As it is below 1 
    Bq/cm3, the criterion to judge re-criticality, we have confirmed that 
    it has not reached re-criticality. Currently, the temperature is 
    approx.75.4°C (as of 5 am on February 12). We are now considering 
    change of the water injection amount. 
  - At 9:57 am on February 12, we started to transfer accumulated water in 
    the underground of turbine building of Unit 3 to the Centralized 
    Radiation Waste Treatment Facility (Process Main Building). 
 
· Fukushima Daini Nuclear Power Station:
    (Units 1 to 4: shutdown due to the earthquake)
 
· Kashiwazaki Kariwa Nuclear Power Station: Units 6: under normal operation
    (Units 1 to 5 and 7: outage due to regular inspections) 
[Thermal Power Station] 
· Power supply has returned to normal and the facilities damaged by the 
  earthquake are now being handled in a timely manner. 
[Hydro Power Station] 
· Power supply has returned to normal and the facilities damaged by the 
  earthquake are now being handled in a timely manner. 
[Impacts on Transmission Facilities] 
· Power supply has returned to normal and the facilities damaged by the 
  earthquake are now being handled in a timely manner. 
[Impacts on Power Supply and Demand Balance] 
This winter, there are some minus factors such as the regular inspection 
of Unit 5 at Kashiwazaki-Kariwa Nuclear Power Station. On the other hand, 
there are several plus factors such as the recovery of the common thermal 
power stations which suffered the earthquake. As a result, we expect to 
secure 53.7 GW (at the end of February) supply power. 
Compared to the maximum demand in the last winter, which is 51.5 GW, we 
will have 2.2 GW generation reserve margin.
 
We expect to maintain stable power supply this winter, however, as there 
remains possibilities of unplanned shutdowns at our power stations and 
growth in the demand according to the rapid change in the temperature, we 
would like to ask your reasonable effort to save electricity.
 
We will continue to make our efforts to maintain stable operation and 
maintenance of the power facilities in order to "prevent in principle" the 
planned blackouts and secure power supply. 
 