search



Corporate Information

 
Press Release (Dec 03,2011)
Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, December 3)
Due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake which occurred on March 
11, 2011, TEPCO's facilities including our nuclear power stations have 
been severely damaged. We deeply apologize for the anxiety and 
inconvenience caused.
With regard to the accident at Fukushima Daiichi Nuclear Power Station, on 
April 17, we have compiled the roadmap towards restoration from the 
accident and then we updated the progress status of roadmap considering 
the current situation, on July 19. Accomplishment of the Step1 target 
"Radiation dose is in steady decline" has been confirmed. On November 17, 
we updated the further progress. 
By bringing the reactors and spent fuel pools to a stable cooling 
condition and mitigating the release of radioactive materials, we will 
make every effort to enable evacuees to return to their homes and for all 
citizens to be able to secure a sound life.

Below is the status of TEPCO's major facilities.

*Underlined are updates from the previous press release.

[Nuclear Power Station] 

·Fukushima Daiichi Nuclear Power Station: Unit 1 to 3: shut down due to 
 the earthquake
  (Units 4 to 6: outage due to regular inspections)

*On December 2, as we finished the construction work to reinforce on-site 
 power, we stopped the evaporative concentration apparatus at 6:00pm on 
 December 2, the water desalinations (reverse osmosis membrane type) at 
 8:04 am on December 3, and the cesium adsorption apparatus at 8:30 am on 
 December 3, respectively, in order to start receiving power from the 
 power source. As for the second cesium adsorption apparatus, it is 
 operated without interruption and the treatment of accumulated water is 
 in progress. There is no adverse effect to water injection into the 
 reactor, as purified water in the buffer tank is utilized. We restarted 
 the water desalinations (reverse osmosis membrane type) at 1:30 pm on 
 December 3 and the cesium adsorption apparatus at 2:22 pm.

*At around 11:00 am on December 3, the water leaked form the cutting point 
 during the cutting work of the hot-water boiler pipe to demolish the 
 machine room etc, which is east side of the building next to service 
 building unit 1 and 2. At 11:30 am on the same day, we found it stopped 
 leaking. The water came from the residual water of the hot-water boiler 
 tank (tank capacity: 14m3) and there is no obvious radiation dosage 
 differences between the water leakage area and the around of the 
 background level.
  
·Fukushima Daini Nuclear Power Station:
  (Units 1 to 4: shutdown due to the earthquake)

·Kashiwazaki Kariwa Nuclear Power Station: Units 5, 6: under normal 
 operation
  (Units 1 to 4 and 7: outage due to regular inspections)

[Thermal Power Station]
-Power supply has returned to normal and facilities damaged by the 
 earthquake are now being handled in a timely manner.

[Hydro Power Station]
-Power supply has returned to normal and facilities damaged by the 
 earthquake are now being handled in a timely manner.

[Impacts on Transmission Facilities]
-Power supply has returned to normal and facilities damaged by the 
 earthquake are now being handled in a timely manner.

[Impacts on Power Supply and Demand Balance]
This winter, there will be some minus factors such as the regular 
inspection of Unit 5 at Kashiwazaki-Kariwa Nuclear Power Station. On the 
other hand, there will be several plus factors such as the recovery of the 
common thermal power stations which suffered the earthquake. As a result, 
we expect to secure 54.9 GW (at the end of December), 54.6 GW (at the end 
of January), 53.7 GW (at the end of February) supply power. 
Compared to the maximum demand in the last winter, which is 51.5 GW, we 
will have 2.2 - 3.4 GW generation reserve margin.

We expect to maintain stable power supply this winter, however, as there 
remains possibilities of unplanned shutdowns at our power stations and 
growth in the demand according to the rapid change in the temperature, we 
would like to ask your reasonable effort to save electricity.

We will continue to make our efforts to maintain stable operation and 
maintenance of the power facilities in order to "prevent in principle" the 
planned blackouts and secure power supply.

Appendix: Past Progress (As of 3:00 pm, December 3, 2011) (PDF 435KB)
Appendix: Past Progress (From March 11, 2011 to July 31, 2011) (PDF 225KB)

* Revised past progress

back to page top


to TOP