Nuclide Analysis Results of Radioactive Materials in Seawater taken near Intake Canal of Fukushima Daiichi Nuclear Power Station (data collected on November 19)
 
At around 9:30 am on April 2, 2011, we detected water containing radiation 
dose over 1,000 mSv/h in the pit* where power supply cables are stored near 
the intake channel of Unit 2. Furthermore, there was a crack of about 20 cm 
length on the concrete lateral of the pit, from where the water in the pit 
was flowing out to the ocean. At around 12:20 pm on April 2, we reaffirmed 
the event at the scene. 
We have implemented sampling of the water in the pit of Unit 2, together 
with the seawater in front of the bar screen near the pit of Unit 2. These 
samples were sent to Fukushima Daini Nuclear Power Station for analyses.

At around 5:38 am on April 6, we observed stoppage of spilling of water to 
the ocean from the crack on the concrete lateral of the pit. 

Since April 5, we have been conducting sampling surveys of the water in the 
pit of Unit 2 and the seawater in front of the bar screen near the pit. 
Regarding the survey results of the detection of three nuclides (iodine 131, 
cesium 134, cesium 137), we report those as definite results, and for the 
other nuclides, we will re-evaluate them.

On April 12, due to the installation of silt fences, we changed the sampling 
points from the front of the bar screen of Unit 4 to the north and the south 
of the inside of the water intake canal of Units 1 to 4. Since April 17, we 
have been conducting an additional sampling survey outside the silt fence 
in front of the bar screen of Unit 2, in order to assess the effect of the 
installation of the silt fence.

On May 11, 2011, responding to out-flow leakage of contaminated water from 
the intake canal of Unit 3, from May 12th, we additionally conducted the 
sampling of the seawater inside and outside of the silt fence in front of 
the bar screen near the pit of Unit 1, 3 and 4. 
                                                    (Previously announced)

On November 19, 2011, we conducted sampling of the seawater near the intake 
canal of Units 1 to 4 of Fukushima Daiichi Nuclear Power Station and 
analyzed the samples. As a result, some radioactive materials were detected 
as described in the appendix. 
We are cleaning intake pump of unit 5 and 6 from November 15.Therefore we 
are increasing sampling point to analyze the effect of this work.We will 
inform you the result soon.

We reported the above results to NISA as well as to the government of 
Fukushima Prefecture today.
We will continuously conduct the same sampling surveys.

*Pit: vertical shaft made of concrete 
Appendix1: Nuclide Analysis Results of Radioactive Materials in Seawater 
           Fukushima Daiichi Nuclear Power Station; the shallow draft quay, 
           Unit 1-4 screen, and the water intake canal of Units 1-4 
                                                              (PDF 13.7KB) 
Appendix2: Nuclide Analysis Results of Radioactive Materials in Seawater 
           at Fukushima Daiichi Nuclear Power Plan intake of unit 5 and 6 
                                                              (PDF 10.8KB) 
Appendix3: Radioactivity Density of Seawater (PDF 43.5KB) 