search



Corporate Information

 
Press Release (Nov 17,2011)
Nuclide Analysis Results of Radioactive Fallout inside and outside the Site of Fukushima Daiichi Nuclear Power Station
 
As a part of reinforcing monitoring activity of the surrounding
environment of Fukushima Daiichi Nuclear Power Station which was damaged
by the Tohoku-Chihou-Taiheiyou-Oki Earthquake, we started sampling of
radioactive fallouts* on August 22, 2011. 
                                       (previously announced on August 17)

We conducted nuclide analysis of the samples collected during the period
from September 22 to November 1, 2011, and radioactive materials were
detected as shown in the appendix. 

We reported today the above results to Nuclear Industry and Safety Agency
as well as to the government of Fukushima Prefecture. 

The analysis results of the three nuclides, Iodine-131, Cesium-134 and
Cesium-137, are released as fixed figures and the other nuclide figures
are to be revaluated. 
Appendix1: Nuclide Analysis Results of Radioactive Fallout at and around 
           the Site of Fukushima Daiichi(PDF 8.46KB) 
Appendix2: Sampling point of fallout (PDF 31.9KB) 
back to page top


to TOP