search



Corporate Information

 
Press Release (May 24,2011)
Submission of a report on the operation of the plant based on the plant data etc. of Fukushima Daiichi Nuclear Power Station at the time of the earthquake to Nuclear and Industrial Safety Agency, Ministry of Economy, Trade and Industry
On April 25th, 2011, we received an instruction notice*1 from Nuclear and 
Industrial Safety Agency (NISA), Ministry of Economy, Trade and Industry 
per Article 67-1 of Act on the Regulation of Nuclear Source Material, 
Nuclear Fuel Material and Reactors.
As per the instruction notice, we collected as much plant data as possible 
at the time of the earthquake, sorted and reported to NISA on May 16th, 
2011.
On the same date, we received an instruction notice from NISA to report 
the effect on the safety of nuclear reactor facilities by analyzing 
records such as the water level in the reactor pressure vessel before and 
after the Tohoku-Chihou-Taiheiyou-Oki-Earthquake in 2011.

                        (Announced on April 26th, 2011 and May 16th, 2011)

As per the instruction notice*2, we reported to NISA on the operation of 
the plant based on the plant data etc. at the time of the earthquake 
yesterday.

Attachment
·Analysis and evaluation of the operation record and accident record of 
 Fukushima Daiichi Nuclear Power Station at the time of Tohoku-Chihou- 
 Taiheiyou-Oki-Earthquake (summary)(PDF 72.8KB) 
·The status of reactors of Units 2 and 3, Fukushima Daiichi Nuclear Power 
 Station, TEPCO(PDF 319KB)
·Analysis and evaluation of the operation record and accident record of Fukushima Daiichi Nuclear Power Station at the time of Tohoku-Chihou- Taiheiyou-Oki-Earthquake (PDF 15.1MB) * 1 Instruction notice Instruction to report per Article 67-1 of Act on the Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors No.1: April 24th, 2011 April 25th, 2011 Taking into consideration the roadmap towards restoration from the accident at Fukushima Daiichi Nuclear Power Station which you have formulated, we hereby instruct you per Article 67-1 of Act on the Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors (Act No. 166 of 1957) to report the following items in a rapid manner in order to take the appropriate emergency steps from here on. In addition, you must ensure that the workers are not exposed to more than the minimum designated amount of radiation while collecting the materials. In case it is expected that prompt reporting will be difficult due to certain circumstances such as the materials to be reported are in areas where the air is filled with highly concentrated radioactive materials and are therefore hard to collect, it must be verified how the materials are being presently being stored, prospects concerning the expected timing of the report, and any other related and necessary conditions and report the results in a rapid manner. If you disagree with this disposition, you may raise an objection with the Minister of Economy, Trade and Industry within sixty days from the day following the date when you learnt that the disposition was made under Article 6 of Administrative Dissatisfaction Inspection Act (Act No. 160 of 1962). However, you may not raise an objection after one year has passed since the day following the date of the disposition even if it falls within sixty days from the day following the date when you learnt that the disposition was made. Based on provision Administrative Case Litigation Act (Act No. 139 of 1962), you may file an action for cancellation of the disposition against the national government (representative; the Minister of Justice) after a decision is made on the aforementioned objection, within six months from the day following the date when you learnt that the decision was made. However, you may not file an action for cancellation after one year has passed since the day following the date of the decision on the objection even if it falls within sixty days from the day following the date when you learnt that the decision was made. If one of the following events happens, you may file an action for cancellation of the disposition without having to wait for a decision on the aforementioned objection: (i) no decision has been made even after three months have passed since the day following the date when you raised the objection, (ii) there is an urgent necessity in order to avoid any considerable damage that would be caused by the original administrative disposition, the execution of the original administrative disposition or the continuation of any subsequent procedure, and (iii) there are any other justifiable grounds not to obtain an administrative decision. ○You have to report the following items among the operation records (including the ones that are made immediately after the occurrence of the Tohoku-Chihou-Taiheiyou-Oki-Earthquake in 2011) prescribed in Article 7-1 of Regulations Concerning the Installment, Operation, etc. of Practical Generation Reactors (The Ministry of International Trade and Industry Order No. 77 of 1978) and accident records of the nuclear reactor facilities etc. in connection with this accident ·The water level inside the Reactor Pressure Vessel ·The pressure inside the Reactor Pressure Vessel ·The temperature inside the Reactor Pressure Vessel ·The pressure inside the drywell of the Primary Containment Vessel ·The pressure inside the Pressure Suppression Chamber of the Primary Containment Vessel ·The water level inside the Pressure Suppression Chamber of the Primary Containment Vessel ·The temperature inside the Pressure Suppression Chamber of the Primary Containment Vessel ·The temperature inside the Primary Containment Vessel ·Density of gas inside the Primary Containment Vessel ·The temperature inside the Spent Fuel Pool ·The flow rate of the Emergency Core Cooling System ·The density of radioactive materials at the exhaust outlet of radioactive wastes and the emission monitoring facilities ·The contents of the alarms set off by the alarming devices ·The track record of the Isolation Cooling Condenser System ·The operation track record of the Reactor Core Isolation Cooling System ·The operation track record of the High Pressure Core Injection System ·The opening and closing track record of the Safety Relief Valves ·The opening and closing track record of the Primary Containment Vessel Ventilation ·The track record of power securement and power restoration ·The operation track record of substitutional measures of water injection such as fire pumps and seawater injection, etc. ·The track record of the treatment of accumulated water in the Turbine Buildings,, the Vertical Shaft, and the Duct for the outside * 2 Instruction notice Our response to the report on the accident report about the accident at Fukushima Daiichi Nuclear Power Station report (instruction) No.2: May 16th, 2011 May 16th, 2011 Today, we got a report from your company about the operation records set out in Article 7-1 of Regulations Concerning the Installment, Operation, etc. of Practical Generation Reactors (The Ministry of International Trade and Industry Order No. 77 of 1978) and accident records of the nuclear reactor facilities etc. in connection with the accident at Fukushima Daiichi Nuclear Power Station ("Accident") per Article 67-1 of Act on the Regulation of Nuclear Source Material, Nuclear Fuel Material and Reactors (Act No. 166 of 1957). We, Nuclear and Industrial Safety Agency ("NISA") decided that, in order to take appropriate and urgent temporary measures, we have to analyze records before and after the earthquake and evaluate the impact on the safety of the nuclear reactor facilities based on that evaluation. Because of this, we order your company to report to us on matters below about the Accident by May 23rd, 2011. As for the content of the report, on matters with abnormalities of nuclear reactor facilities, we order you to analyze the cause of the abnormalities whether the earthquake or the tsunami. The evaluation result of the impact on safety of the nuclear reactor facilities by analyzing the water level in the reactor pressure vessels etc. before and after the occurrence of Tohoku-Chihou-Taiheiyou-Oki- Earthquake in 2011. ·Whether there were abnormalities of the nuclear reactor facilities before the earthquake ·The status of the reactor after the emergency shutdown of the reactor by the earthquake ·Water level, temperature and pressure control of the reactor pressure vessel after the emergency shutdown of the reactor by the earthquake ·The operation status of the Isolation Cooling Condenser System and the Reactor Core Isolation Cooling System by the earthquake ·The operation status of the Emergency Core Cooling System by the earthquake ·The existence of abnormalities of nuclear reactor facilities such as break of the main steam piping before tsunami and after tsunami after the emergency shutdown of the reactor ·The status of reactors of Units 1, 2 and 3 before and after the earthquake ·The status of securing the emergency electricity facility before and after the earthquake ·Whether there was release of radiation and radioactive materials to the outside before and after the earthquake
back to page top


to TOP