search



Corporate Information

 
Press Release (May 09,2011)
Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 AM, May 9)

Due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake which occurred on March 
11th 2011, TEPCO's facilities including our nuclear power stations have 
been severely damaged. We deeply apologize for the anxiety and 
inconvenience caused.
With regard to the accident at Fukushima Daiichi Nuclear Power Station, 
on April 17th, we have put together the roadmap towards restoration from 
the accident. By bringing the reactors and spent fuel pools to a stable 
cooling condition and mitigating the release of radioactive materials, 
we will make every effort to enable evacuees to return to their homes and 
for all citizens to be able to secure a sound life.

Below is the status of TEPCO's major facilities.
*Updates from previous press release are underlined. 
[Nuclear Power Station] 
Fukushima Daiichi Nuclear Power Station: 
 Units 1 to 3: shutdown due to the earthquake 
  (Units 4 to 6: outage due to regular inspections) 

- At 4:36 pm on May 5th, we started to ventilate with 6 local exhausters 
  the reactor building of Unit 1 in order to improve the working 
  environment of the building. Consequently, we confirmed that 
  radioactivity density inside of the reactor building decreased enough, 
  and opened the double doors (removed the duct of the local exhauster) 
  of the reactor building at 8:08 pm on May 8th. After removing sheets 
  used for the installation of the local exhausters, we opened the double 
  doors of the reactor building at 4:17 am on May 9th. Then, we confirmed 
  air dose rate as of 5:00 am and evaluated that there was no impact on 
  the surrounding area. 
- On May 8th, we sprayed dust inhibitor to approx. 5,100 m2 of areas 
  including the west side of Shallow Draft Quay, using the conventional 
  method. 
- Strontium 89 and 90 have been detected from samples collected on April 
  18th from 3 regular sampling points. 
Fukushima Daini Nuclear Power Station: 
  Units 1 to 4: shutdown due to the earthquake 
Kashiwazaki Kariwa Nuclear Power Station: 
  Units 1, 5, 6, 7: normal operation 
  (Units 2 to 4: outage due to regular inspection) 
[Thermal Power Station] 
- Hirono Thermal Power Station Unit 2 and 4: Shutdown due to the earthquake
- Hitachinaka Thermal Power Station Unit 1: Shutdown due to the earthquake 
[Hydro Power Station] 
- Power supply has returned to normal and facilities damaged by the 
  earthquake are now being handled in a timely manner. 
[Impacts on Transmission Facilities] 
- Power supply has returned to normal and facilities damaged by the 
  earthquake are now being handled in a timely manner. 
[Avoidance of further Implementation on Planned Rolling Blackouts and 
Request for Conserving Electricity Consumption] 
Currently, we are working to restore electricity supply after our nuclear 
and thermal power facilities were severely damaged by Tohoku-Chihou-
Taiheiyou-Oki Earthquake. The widespread understanding and cooperation of 
our customers to conserve electricity have contributed to the improvement 
of this tight power supply-demand balance situation.
Amidst this backdrop, since the electricity supply will be able to balance 
with the demand for the time being, we have decided not to implement 
further rolling blackouts in principle.
However, we sincerely ask for your continued cooperation in reducing 
electricity consumption due to the possible increase in demand caused by 
warmer weather or unexpected trouble at power stations that are currently 
being restored to service. In case the electricity supply-demand balance 
becomes tighter than expected, we may regrettably need to restart the 
implementation of rolling blackouts, with prior notice. We kindly ask for 
your cooperation.
We will do our best to maintain this policy of avoiding further 
implementation of rolling blackouts during the summer. 
Appendix: Past Progress (PDF 119KB) 
 
* Revised past progress 
back to page top