Due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake which occurred on March
11th 2011, TEPCO's facilities including our nuclear power stations have
been severely damaged. We deeply apologize for the anxiety and
inconvenience caused.
With regard to the accident at Fukushima Daiichi Nuclear Power Station, on
April 17th, we have put together the roadmap towards restoration from the
accident. By bringing the reactors and spent fuel pools to a stable cooling
condition and mitigating the release of radioactive materials, we will make
every effort to enable evacuees to return to their homes and for all
citizens to be able to secure a sound life.
Below is the status of TEPCO's major facilities.
*Updates from previous press release are underlined.
[Nuclear Power Station]
Fukushima Daiichi Nuclear Power Station:
Units 1 to 3: shutdown due to the earthquake
(Units 4 to 6: outage due to regular inspections)
-At 4:36pm on May 5th, we started to ventilate with 6 local exhausters the
reactor building of Unit 1 in order to improve the working environment of
the building.
-From 12:38 pm on May 6th, we started water spay to Unit 4 by the concrete
pumping vehicle. It was finished at 5:51pm on the same day.
-The transfer of accumulated water in Unit 6 turbine building to a
temporary tank was started at 2:00 pm on May 6th. The pump was stopped at
5:00pm on the same day (approx.120m3).
-On May 6th: spraying dust inhibitor in order to prevent diffusion of
radioactive materials to the approx. 4,000m2 areas on the west side of the
Unit 1 reactor building using the unmanned crawler dump truck.
-On May 6th: spraying to areas including the mountain side of Shallow Draft
Quay using the conventional method.
Fukushima Daini Nuclear Power Station:
Units 1 to 4: shutdown due to the earthquake
Kashiwazaki Kariwa Nuclear Power Station:
Units 1, 5, 6, 7: normal operation
(Units 2 to 4: outage due to regular inspection)
[Thermal Power Station]
-Hirono Thermal Power Station Unit 2 and 4: Shutdown due to the earthquake
-Hitachinaka Thermal Power Station Unit 1: Shutdown due to the earthquake
[Hydro Power Station]
-Power supply has returned to normal and facilities damaged by the
earthquake are now being handled in a timely manner.
[Impacts on Transmission Facilities]
-Power supply has returned to normal and facilities damaged by the
earthquake are now being handled in a timely manner.
[Avoidance of further Implementation on Planned Rolling Blackouts and
Request for Conserving Electricity Consumption]
Currently, we are working to restore electricity supply after our nuclear
and thermal power facilities were severely damaged by Tohoku-Chihou-
Taiheiyou-Oki Earthquake. The widespread understanding and cooperation of
our customers to conserve electricity have contributed to the improvement
of this tight power supply-demand balance situation.
Amidst this backdrop, since the electricity supply will be able to balance
with the demand for the time being, we have decided not to implement
further rolling blackouts in principle.
However, we sincerely ask for your continued cooperation in reducing
electricity consumption due to the possible increase in demand caused by
warmer weather or unexpected trouble at power stations that are currently
being restored to service. In case the electricity supply-demand balance
becomes tighter than expected, we may regrettably need to restart the
implementation of rolling blackouts, with prior notice. We kindly ask for
your cooperation.
We will do our best to maintain this policy of avoiding further
implementation of rolling blackouts during the summer.
Appendix:Past Progress (PDF 278KB)
* Revised past progress