1.Overview
- Oct 21, 2014
- Multi-nuclide Removal Equipment ("ALPS") (Existing/ Improved / High-performance) (PDF 384KB)
![](/common_files/images/com_ic07.gif)
![NEW](/en/common/images/icon/icon_new_02.gif)
- Jan 27, 2014
- Status of the Fukushima Daiichi Nuclear Power Station (PDF 5.85MB)
![](/common_files/images/com_ic07.gif)
- Nov 8, 2013
- Immediate release: Multi-Pronged Effort Underway to Make Fukushima Safer, Speed Cleanup, TEPCO Says in New Report
- Oct 31, 2013
- Storage Condition of Accumulated Water (PDF 341KB)
- Sep 30, 2013
- (1) Current Situations Concerning Contaminated Water (PDF 239KB)
- Sep 30, 2013
- (2) Measures against Contaminated Water/Outlines of Fundamental Measures (PDF 171KB)
- Sep 30, 2013
- (3) Measures against Contaminated Water/Outlines of Emergency Measures (PDF 509KB)
- Sep 30, 2013
- (4)Contaminated Water Leakage from a Tank / Current Status (PDF 265KB)
- Sep 30, 2013
- (5)Contaminated Water Leakage from a Tank / Measures for Risk Reduction (PDF 356KB)
- Sep 17, 2013
- Fukushima Daiichi Nuclear Power Station Video Tour
![](/en/decommision/common/images/icon/ico_corporate.gif)
- Aug 26, 2013
- Measures against Contaminated Water Outlines of Emergency Measures (PDF 399KB)
- Aug 26, 2013
- Measures against Contaminated WaterOutlines of Fundamental Measures (PDF 169KB)
- Aug 26, 2013
- Current Situations Concerning Contaminated Water (PDF 241KB)
- Jul 22, 2013
- Increases in the Concentration of Radioactive Materials in Seawater and Groundwater on the Ocean Side of the Site: Current Situation and Countermeasures (PDF 1.62MB)
[Houndouts]
2. Measures to Protect the Ocean
3. Measures to Prevent Groundwater Contamination
About the Land-side Impermeable Wall
- Aug 18, 2014
- Questions on the "Ice Wall"
![NEW](/en/common/images/icon/icon_new_02.gif)
About the Frozen Pipe Method (Method to remove contaminated water inside the seaside trenches)
About the Groundwater Bypass System
4. Measures for the Leakage from the Tanks at Fukushima Daiichi
- Oct 3,2013
- Leakage from B Area (South Side) Tank
![](/en/decommision/common/images/icon/ico_corporate.gif)
- Sep 17,2013
- Regarding the accumulated water in the dam surrounding the contaminated water tanks due to the heavy rain from Typhoon No. 18
![](/en/decommision/common/images/icon/ico_corporate.gif)
- Sep 12,2013
- Contaminated Water Leakage from the Tank in the H4 Area (follow-up info)
![](/en/decommision/common/images/icon/ico_corporate.gif)
- Sep 04,2013
- Strengthening our patrol of the tanks
![](/en/decommision/common/images/icon/ico_corporate.gif)
- Sep 02,2013
- Regarding the high radiation levels found at the flange parts of tanks and a connecting pipe between tanks in Fukushima Daiichi NPS on August 31(PDF 6.88KB)
![](/common_files/images/com_ic07.gif)
- Sep 01,2013
- Explanation regarding the high radiation (maximum 1,800 mSv) found at tanks in Fukushima Daiichi NPS on August 31, 2013
![](/en/decommision/common/images/icon/ico_corporate.gif)
- Aug 26, 2013
- Contaminated Water Leakage from the Tank in the H4 Area (follow-up)
![](/en/decommision/common/images/icon/ico_corporate.gif)
- Aug 26, 2013
- Countermeasures to mitigate risks regarding the water leak from the tank (PDF 1.25MB)
[Press Releases]
- Aug 21, 2013
- Contaminated Water Leakage from the Tank in the H4 Area
![](/en/decommision/common/images/icon/ico_corporate.gif)
- Acrobat® Reader In Order to view the PDF documents, you will need a software product called Adobe® Acrobat® Reader installed on your computer. You can download this software product for free from Adobe's Web site by clicking the left button:
![](/common_files/images/com_ic05.gif)