TEPCO has taken measures against faults caused by natural factors and equipments defects, represented by discharge clamp to prevent break of insulated wires by lightning as well as quality management system for distribution equipments. These measures result in System Average Interruption Duration Index (SAIDI) of 2 minutes in TEPCO (as of FY2005). Through its experiences and know-how, TEPCO can provide consultancy services on prevention of these forced faults aiming at reduction of outage duration.
By introducing Automated Distribution System, quicker restoration from accident is made possible. and quality of service is improved to many of the affected customers.
It not only reduces labor work of operating switchgears at site, but enables to make the utmost use of distribution lines with enough capacity much easier.
TEPCO does consultancy service on "Planned Outage Reduction Measures" by using our experiences and achievements for higher reliability realization.