The reports on our facility management plan for Units 1-4 of Fukushima Daiichi Nuclear Power Station based on the "Policy on the Mid-term Security"* (Version 2) (Revision 2) and (Version 3) (Revision) have been changed and submitted to the Nuclear Regulation Authority today.
The following changes were made this time.
Report on our facility management plan for Units 1-4 of Fukushima Daiichi Nuclear Power Station based on the "Policy on the Mid-term Security" (Version 2) (Revision 2)
- Spent fuel dry cask temporary storage facility
Report on our facility management plan for Units 1-4 of Fukushima Daiichi Nuclear Power Station based on the "Policy on the Mid-term Security" (Version 3) (Revision)
- Radiation protection and control
- Instructions on managing radiation exposure through radioactive materials and objects contaminated by radioactive materials and disposing radioactive waste
We will continue our utmost efforts in ensuring safety at Units 1-4 of Fukushima Daiichi Nuclear Power Station in accordance with the facility management plan (version 1-3) we have developed.
Attachments
- Spent fuel dry cask temporary storage facility (PDF 6.89MB)
- Radiation protection and control (PDF 301KB)
- Instructions on managing radiation exposure through radioactive materials and objects contaminated by radioactive materials and disposing radioactive waste (PDF 735KB)
* Report on our facility management plan for Unit 1-4 of Fukushima Daiichi Nuclear Power Station based on the "Policy on the Mid-term Security"
The "policy on the mid-term security of Fukushima Daiichi Nuclear Power Station Units 1-4" for ensuring public and employee safety during the period from the end of step 2 to the work commencement towards reactor decommissioning.
The aforementioned documents are available only in Japanese. We apologize for the inconvenience this may cause.