On November 7, we received a document* "Submission of an Implementation Plan of the Measures to be Taken for the Specified Reactor Facilities to be Installed at Fukushima Daiichi Nuclear Power Station" from the Nuclear Regulation Authority.
(Previously announced on November 7, 2012)
In accordance with the document received, we have developed an implementation plan of measures for ensuring security and protecting the specified nuclear fuel at Fukushima Daiichi Nuclear Power Station designated as a specified reactor facility, and submitted it to the Nuclear Regulation Authority today.
< Attachment >
Implementation plan of the measures to be taken at Fukushima Daiichi Nuclear Power Station designated as a specified reactor facility
The document is available only in Japanese. We apologize for the inconvenience this may cause.
< Reference >
Implementation plan of the measures to be taken at Fukushima Daiichi Nuclear Power Station designated as a specified reactor facility (Outline)(PDF 367KB)
*Document
"Submission of an Implementation Plan of the Measures to be Taken for the Specified Reactor Facilities to be Installed at Fukushima Daiichi Nuclear Power Station"
The document is available only in Japanese. We apologize for the inconvenience this may cause.