Today, we were notified from Electric Power Development Co., Ltd. that Unit 2 of their Isogo Thermal Power Station (Yokohama City, Kanagawa Prefecture, rated output: 600MW) had been suspended at 10:06 AM today due to a problem with its turbine.
Our today's supply capacity is 46,500MW and the usage rate is estimated to be 90% (reserve margin: 10.2%).