We received a directive document* "Measures against water leakage from the accumulated water transfer pipe in Unit 4 Turbine Building at TEPCO Fukushima Daiichi Nuclear Power Station (Direction)" from NISA. (Previously announced on August 17, 2012)
According to the direction given, we have reported to NISA on item 3 and 4 (for which the report due date is August 27, 2012).
As for item 3, our plan of replacing the anti-pressure hose currently used for the contaminated water transfer pipelines with polyethylene pipe has been clarified.
The updated "Implementation Plan on Reliability Improvement Measures at Fukushima Daiichi Nuclear Power Station" (Revised on July 24) will be submitted along with our report on item 2 after completing the overall risk evaluation (including the risk related to the replacement of contaminated water transfer pipelines with polyethylene pipe) to be conducted for the purpose of ensuring safety and improving reliability.
We will report to NISA on item 1 and 2 by September 13, 2012.
End
Attachment
"Measures against water leakage from the accumulated water transfer pipeline in Unit 4 Turbine Building at Fukushima Daiichi Nuclear Power Station (Report: No.1)"(PDF 456KB)
* Directive document
"Measures against water leakage from the accumulated water transfer pipeline in Unit 4 Turbine Building at Fukushima Daiichi Nuclear Power Station (Direction)" (August 16, 2012 NISA No.1)
The aforementioned documents are available only in Japanese. We apologize for the inconvenience this may cause.
* In the previous press release it said "Previously mentioned on August 6, 2012", however it has been corrected to "Previously mentioned on August 17, 2012". We apologize for the mistake. (Corrected on September 13, 2012)