search



Corporate Information

 
Press Release (Mar 12,2012)
Received the directive from NISA regarding isolation condenser In Establishment Permit Application of Unit 1 at Fukushima Daiichi Nuclear Power Station
 
Regarding this matter, we received a directive* titled "Regarding the
reflection of changing connection measure to re-circulating system of
drain pipes in the isolation condenser of Unit 1 at TEPCO Fukushima
Daiichi Nuclear Power Station (directive)" from Nuclear and Industrial
Safety Agency (NISA) of Ministry of Economy, Trade and Industry today.
We immediately report on results for this directive to NISA in future. 
 
                                                                       End 
 
Attachment: Reports on the reflection of the changes in the connection 
            method of the drain pipe in Isolation Condenser in Unit 1at 
            Fukushima Daiichi Nuclear Power Station to the re-circulating 
            system (PDF 47.1KB) 
 
* directive 
Regarding the reflection of changing connection measure to re-circulating
system of drain pipes in the isolation condenser of Unit 1 at TEPCO
Fukushima Daiichi Nuclear Power Station (directive)
                                                 (February 17, 2012, NISA)
 
We have provided a Japanese press release version of the instruction
document received from NISA. However, at this time we have reserved the
right not to provide an English version due to potential misunderstandings
that may arise from an inaccurate rendering of the original Japanese text.
We may provide the English translation that NISA releases in our press
releases. However, in principle we would advise you to visit the NISA
website for timely and accurate information. 
back to page top


to TOP