Press Release (Feb 16,2012)
Submission of a report on the correspondence for temperature increase in the lower part of the Reactor Pressure Vessel of Unit 2 at TEPCO Fukushima Daiichi Nuclear Power Station to NISA
 On February 13, 2012, we received an instruction document* titled 
"Submission request for report on the correspondence for temperature 
increase in the lower part of the Reactor Pressure Vessel of Unit 2 
at TEPCO Fukushima Daiichi Nuclear Power Station " from Nuclear and 
Industrial Safety Agency (NISA) of Ministry of Economy, Trade and 
Industry. 
                           (Previously announced on February 14, 2012) 
 
Thereafter we have organized a report including the assumed causes 
of the fluctuating temperature readings of the thermometers, etc., 
regarding the temperature increase at the lower part of the Reactor 
Pressure Vessel of Unit 2, and submitted the report to NISA yesterday. 
 
                                                                   END 
Attachment
Report on Measures Based on Temperature Rise in the Bottom Section Reactor Pressure Vessel
of Reactor #2 at the Fukushima Daiichi Nuclear Power Station (PDF 1.09MB)

 * Instruction document 
Submission request for report on the correspondence for temperature 
increase in the lower part of the Reactor Pressure Vessel of Unit 2 
at TEPCO Fukushima Daiichi Nuclear Power Station 
(February 13, 2012, NISA) 
 
We have provided a Japanese press release version of the instruction 
document received from NISA. However, at this time we have reserved the 
right not to provide an English version due to potential misunderstandings 
that may arise from an inaccurate rendering of the original Japanese text. 
We may provide the English translation that NISA releases in our press 
releases. However, in principle we would advise you to visit the NISA 
website for timely and accurate information.  
back to page top


to TOP