We partially corrected "the report with regard to 'Policy on the mid term
security' for the Units 1 to 4 of Fukushima Daiichi Nuclear Power Station
to Nuclear and Industrial Safety Agency at the Ministry of Economy, Trade
and Industry (2) (Revised)" which we announced on January 18, 2011 as
indicated in the appendix and reported to Nuclear and Industrial Safety
Agency today. 

We continuously take account of opinions gathered by public hearings and
we will take all possible measures to ensure safety at Units 1 to 4,
Fukushima Daiichi Nuclear Power Station based on the facility operation
plan (1-3) we have compiled to date.

<Place and content of the correction>
Page 2-9
Location of storage: storage volume of tanks etc in "Table 2-1:
Radioactive Solid Waste Storage Volume before the accident"

After correction: 3,507 m3 (before correction: 3,497 m3)